PadstakeGet the fee reports
Menu

Site-work prices, Dallas, Polk County, IA

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSY5$42.00$30.65 to $74.00
Bids
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $74.00 per SY · qty 1374.7 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $42.00 per SY · qty 586.7 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $37.75 per SY · qty 4577.8 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $30.65 per SY · qty 2117.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $60.80 per SY · qty 542.2 · bid tab
asphalt pavementTON1$47.75$47.75 to $47.75
Bids
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $47.75 per TON · qty 13940.03 · bid tab
concrete pavementEACH6$1.00$1.00 to $1.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $1.00 per EACH · qty 9028.66 · bid tab
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $1.00 per EACH · qty 5787.6 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $1.00 per EACH · qty 10118.41 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $1.00 per EACH · qty 6486.2 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $1.00 per EACH · qty 25000.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $1.00 per EACH · qty 16000.0 · bid tab
concrete pavementLS1$25,000.00$25,000.00 to $25,000.00
Bids
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $25,000.00 per LS · qty 1.0 · bid tab
concrete pavementSY6$101.77$78.00 to $130.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $103.53 per SY · qty 7716.8 · bid tab
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $106.38 per SY · qty 4553.3 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $100.00 per SY · qty 8648.21 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $99.95 per SY · qty 9666.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $78.00 per SY · qty 21202.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $130.00 per SY · qty 1244.3 · bid tab
excavation embankmentCY10$15.00$2.20 to $26.80
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $15.00 per CY · qty 48097.0 · bid tab
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $15.00 per CY · qty 120.0 · bid tab
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $15.00 per CY · qty 2074.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $15.00 per CY · qty 55088.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $15.00 per CY · qty 4758.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $26.80 per CY · qty 420.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $22.50 per CY · qty 26166.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $4.85 per CY · qty 2867.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $2.20 per CY · qty 74491.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $26.00 per CY · qty 84.4 · bid tab
lime cement stabilizationACRE5$150.00$150.00 to $220.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $220.00 per ACRE · qty 13.53 · bid tab
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $220.00 per ACRE · qty 2.5 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $150.00 per ACRE · qty 15.95 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $150.00 per ACRE · qty 8.2 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $150.00 per ACRE · qty 70.0 · bid tab
lime cement stabilizationLF5$52.00$35.00 to $60.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $35.00 per LF · qty 1100.0 · bid tab
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $35.00 per LF · qty 200.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $60.00 per LF · qty 1100.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $59.39 per LF · qty 300.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $52.00 per LF · qty 1700.0 · bid tab
lime cement stabilizationSF2$57.62$55.25 to $60.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $55.25 per SF · qty 14520.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $60.00 per SF · qty 17662.0 · bid tab
lime cement stabilizationSY3$2.00$2.00 to $5.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $2.00 per SY · qty 51682.1 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $2.00 per SY · qty 35982.9 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $5.00 per SY · qty 2000.0 · bid tab
manholeEACH11$10,875.00$798.00 to $19,100.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $1,250.00 per EACH · qty 16.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $2,110.00 per EACH · qty 8.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $19,100.00 per EACH · qty 1.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $10,875.00 per EACH · qty 1.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $12,050.00 per EACH · qty 4.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $8,425.00 per EACH · qty 1.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $11,760.00 per EACH · qty 1.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $11,150.00 per EACH · qty 2.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $9,995.00 per EACH · qty 1.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $14,825.00 per EACH · qty 1.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
sidewalkEACH5$8,850.00$5,450.00 to $14,000.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $14,000.00 per EACH · qty 2.0 · bid tab
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $6,000.00 per EACH · qty 4.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $5,450.00 per EACH · qty 27.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $8,850.00 per EACH · qty 14.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $13,100.00 per EACH · qty 5.0 · bid tab
sidewalkSY1$67.05$67.05 to $67.05
Bids
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $67.05 per SY · qty 1629.0 · bid tab
storm pipe 15-inchLF3$72.00$59.00 to $120.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $120.00 per LF · qty 354.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $59.00 per LF · qty 2303.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $72.00 per LF · qty 10.0 · bid tab
storm pipe 18-inchLF1$62.50$62.50 to $62.50
Bids
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $62.50 per LF · qty 599.0 · bid tab
storm pipe 24-inchLF10$135.00$78.00 to $190.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $140.00 per LF · qty 325.0 · bid tab
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $145.00 per LF · qty 357.0 · bid tab
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $180.00 per LF · qty 61.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $125.00 per LF · qty 323.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $190.00 per LF · qty 20.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $175.00 per LF · qty 60.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $130.00 per LF · qty 197.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $80.00 per LF · qty 96.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $78.00 per LF · qty 543.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $78.00 per LF · qty 72.0 · bid tab
storm pipe 30-inchLF6$185.00$100.00 to $230.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $205.00 per LF · qty 19.0 · bid tab
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $180.00 per LF · qty 278.0 · bid tab
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $160.00 per LF · qty 36.0 · bid tab
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $230.00 per LF · qty 23.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $190.00 per LF · qty 22.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $100.00 per LF · qty 551.0 · bid tab
storm pipe 36-inchLF2$181.25$162.50 to $200.00
Bids
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $200.00 per LF · qty 44.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $162.50 per LF · qty 628.0 · bid tab
storm pipe 42-inchLF3$197.00$190.00 to $218.00
Bids
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $190.00 per LF · qty 1154.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $197.00 per LF · qty 60.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $218.00 per LF · qty 174.0 · bid tab
storm pipe 48-inchLF4$300.25$203.50 to $650.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $650.00 per LF · qty 11.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $390.00 per LF · qty 36.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $210.50 per LF · qty 931.0 · bid tab
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $203.50 per LF · qty 254.0 · bid tab
storm pipe 54-inchLF2$787.50$675.00 to $900.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $675.00 per LF · qty 11.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $900.00 per LF · qty 9.0 · bid tab
storm pipe 60-inchLF1$272.00$272.00 to $272.00
Bids
  • 2025-01-22 · Iowa DOT · 77-1417-058 · $272.00 per LF · qty 160.0 · bid tab
storm pipe 66-inchLF2$850.00$700.00 to $1,000.00
Bids
  • 2026-01-21 · Iowa DOT · 25-0803-290 · $700.00 per LF · qty 23.0 · bid tab
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $1,000.00 per LF · qty 12.0 · bid tab
storm pipe 72-inchLF1$2,000.00$2,000.00 to $2,000.00
Bids
  • 2025-01-22 · Iowa DOT · 25-0803-286 · $2,000.00 per LF · qty 10.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.