Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|---|---|---|---|---|
| asphalt pavement | SY | 1 | $152.60 | $152.60 to $152.60 | Bids
|
| concrete pavement | EACH | 2 | $1.00 | $1.00 to $1.00 | |
| concrete pavement | SY | 2 | $167.25 | $59.50 to $275.00 | |
| excavation embankment | CY | 1 | $3.30 | $3.30 to $3.30 | Bids
|
| lime cement stabilization | ACRE | 1 | $200.00 | $200.00 to $200.00 | Bids
|
| lime cement stabilization | LF | 1 | $40.00 | $40.00 to $40.00 | Bids
|
| lime cement stabilization | SY | 1 | $1.30 | $1.30 to $1.30 | Bids
|
| sidewalk | EACH | 1 | $5,800.00 | $5,800.00 to $5,800.00 | Bids
|
| storm pipe 18-inch | LF | 1 | $45.00 | $45.00 to $45.00 | Bids
|
| storm pipe 24-inch | LF | 1 | $110.00 | $110.00 to $110.00 | Bids
|
| storm pipe 30-inch | LF | 1 | $125.00 | $125.00 to $125.00 | Bids
|