| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| concrete pavement | EACH | 6 | $1.00 | $1.00 to $1.00 | Bids- 2025-07-15 · Iowa DOT · 08-C008-093 · $1.00 per EACH · qty 9584.41 · bid tab
- 2025-07-15 · Iowa DOT · 08-C008-093 · $1.00 per EACH · qty 6143.85 · bid tab
- 2025-02-18 · Iowa DOT · 08-0304-111 · $1.00 per EACH · qty 76073.3 · bid tab
- 2025-02-18 · Iowa DOT · 08-0304-111 · $1.00 per EACH · qty 17403.75 · bid tab
- 2024-12-17 · Iowa DOT · 08-0304-092 · $1.00 per EACH · qty 9711.0 · bid tab
- 2024-12-17 · Iowa DOT · 08-0304-092 · $1.00 per EACH · qty 6225.0 · bid tab
|
| concrete pavement | LS | 1 | $500.00 | $500.00 to $500.00 | Bids- 2025-07-15 · Iowa DOT · 08-C008-093 · $500.00 per LS · qty 1.0 · bid tab
|
| concrete pavement | SY | 5 | $64.00 | $45.00 to $147.00 | Bids- 2025-07-15 · Iowa DOT · 08-C008-093 · $45.00 per SY · qty 8191.8 · bid tab
- 2025-02-18 · Iowa DOT · 08-0304-111 · $63.75 per SY · qty 24578.9 · bid tab
- 2025-02-18 · Iowa DOT · 08-0304-111 · $72.50 per SY · qty 2462.9 · bid tab
- 2024-12-17 · Iowa DOT · 08-0304-092 · $64.00 per SY · qty 8584.1 · bid tab
- 2024-11-19 · Iowa DOT · 08-6040-601 · $147.00 per SY · qty 342.0 · bid tab
|
| excavation embankment | CY | 8 | $13.38 | $5.00 to $75.00 | Bids- 2025-10-22 · Iowa DOT · 08-2102-023 · $75.00 per CY · qty 30.0 · bid tab
- 2025-07-15 · Iowa DOT · 08-C008-093 · $14.75 per CY · qty 8517.0 · bid tab
- 2025-07-15 · Iowa DOT · 08-C008-093 · $8.00 per CY · qty 1600.0 · bid tab
- 2025-02-18 · Iowa DOT · 08-0304-111 · $16.00 per CY · qty 3291.0 · bid tab
- 2025-02-18 · Iowa DOT · 08-0304-111 · $12.00 per CY · qty 1144.0 · bid tab
- 2024-12-17 · Iowa DOT · 08-0304-092 · $5.00 per CY · qty 9562.0 · bid tab
- 2024-11-19 · Iowa DOT · 08-6040-601 · $7.00 per CY · qty 620.0 · bid tab
- 2024-11-19 · Iowa DOT · 08-6040-601 · $22.00 per CY · qty 480.0 · bid tab
|
| lime cement stabilization | ACRE | 2 | $287.50 | $175.00 to $400.00 | Bids- 2025-07-15 · Iowa DOT · 08-C008-093 · $175.00 per ACRE · qty 11.2 · bid tab
- 2024-11-19 · Iowa DOT · 08-6040-601 · $400.00 per ACRE · qty 0.8 · bid tab
|
| lime cement stabilization | LF | 1 | $90.00 | $90.00 to $90.00 | Bids- 2025-10-22 · Iowa DOT · 08-2102-023 · $90.00 per LF · qty 700.0 · bid tab
|
| lime cement stabilization | SY | 1 | $5.00 | $5.00 to $5.00 | Bids- 2024-12-17 · Iowa DOT · 08-0304-092 · $5.00 per SY · qty 7083.0 · bid tab
|
| storm pipe 15-inch | LF | 1 | $80.00 | $80.00 to $80.00 | Bids- 2024-12-17 · Iowa DOT · 08-0304-092 · $80.00 per LF · qty 150.0 · bid tab
|
| storm pipe 18-inch | LF | 2 | $95.00 | $85.00 to $105.00 | Bids- 2024-12-17 · Iowa DOT · 08-0304-092 · $85.00 per LF · qty 153.0 · bid tab
- 2024-12-17 · Iowa DOT · 08-0304-092 · $105.00 per LF · qty 16.0 · bid tab
|
| storm pipe 24-inch | LF | 2 | $110.00 | $100.00 to $120.00 | Bids- 2025-09-16 · Iowa DOT · 08-0304-118 · $100.00 per LF · qty 19.0 · bid tab
- 2024-12-17 · Iowa DOT · 08-0304-092 · $120.00 per LF · qty 264.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $302.50 | $55.00 to $550.00 | Bids- 2025-02-18 · Iowa DOT · 08-0304-111 · $550.00 per LF · qty 48.0 · bid tab
- 2024-11-19 · Iowa DOT · 08-6040-601 · $55.00 per LF · qty 184.0 · bid tab
|
| storm pipe 42-inch | LF | 1 | $650.00 | $650.00 to $650.00 | Bids- 2025-02-18 · Iowa DOT · 08-0304-111 · $650.00 per LF · qty 72.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $260.00 | $260.00 to $260.00 | Bids- 2024-12-17 · Iowa DOT · 08-0304-092 · $260.00 per LF · qty 72.0 · bid tab
|
| storm pipe 54-inch | LF | 1 | $780.00 | $780.00 to $780.00 | Bids- 2025-02-18 · Iowa DOT · 08-0304-111 · $780.00 per LF · qty 24.0 · bid tab
|