Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTN8$155.55$150.00 to $288.75
Bids
  • 2025-08-27 · FDOT (District 2) · T2A35 · $193.00 per TN · qty 2992.5 · bid tab
  • 2025-08-27 · FDOT (District 2) · T2A35 · $151.00 per TN · qty 1786.9 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $283.50 per TN · qty 309.9 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $288.75 per TN · qty 554.8 · bid tab
  • 2025-01-29 · FDOT (District 2) · T2A14 · $150.00 per TN · qty 19935.3 · bid tab
  • 2025-01-29 · FDOT (District 2) · T2A14 · $155.00 per TN · qty 11870.7 · bid tab
  • 2024-12-04 · FDOT (District 2) · T2A09 · $156.10 per TN · qty 7394.6 · bid tab
  • 2024-12-04 · FDOT (District 2) · T2A09 · $151.20 per TN · qty 10424.3 · bid tab
concrete pavementSY1$214.91$214.91 to $214.91
Bids
  • 2025-04-30 · FDOT (District 2) · T2A28 · $214.91 per SY · qty 159.0 · bid tab
curb gutterLF6$69.15$28.00 to $180.08
Bids
  • 2025-12-03 · FDOT (District 2) · T2A53 · $120.00 per LF · qty 318.0 · bid tab
  • 2025-08-27 · FDOT (District 2) · T2A35 · $85.00 per LF · qty 13.0 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $180.08 per LF · qty 5.0 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $43.89 per LF · qty 894.0 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $53.30 per LF · qty 152.0 · bid tab
  • 2025-01-29 · FDOT (District 2) · T2A14 · $28.00 per LF · qty 85.0 · bid tab
excavation embankmentCY4$96.50$46.00 to $500.00
Bids
  • 2025-12-03 · FDOT (District 2) · T2A53 · $110.00 per CY · qty 1043.9 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $46.00 per CY · qty 501.8 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $83.00 per CY · qty 232.7 · bid tab
  • 2025-01-29 · FDOT (District 2) · T2A14 · $500.00 per CY · qty 4.6 · bid tab
flexible baseSY1$253.81$253.81 to $253.81
Bids
  • 2025-04-30 · FDOT (District 2) · T2A28 · $253.81 per SY · qty 29.0 · bid tab
lime cement stabilizationSY3$44.00$18.77 to $132.20
Bids
  • 2025-04-30 · FDOT (District 2) · T2A28 · $18.77 per SY · qty 1564.0 · bid tab
  • 2025-01-29 · FDOT (District 2) · T2A14 · $44.00 per SY · qty 197.0 · bid tab
  • 2024-12-04 · FDOT (District 2) · T2A09 · $132.20 per SY · qty 90.0 · bid tab
manholeEA4$16,293.38$875.00 to $17,726.75
Bids
  • 2025-12-03 · FDOT (District 2) · T2A53 · $17,726.75 per EA · qty 2.0 · bid tab
  • 2025-12-03 · FDOT (District 2) · T2A53 · $17,726.75 per EA · qty 3.0 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $14,860.00 per EA · qty 2.0 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $875.00 per EA · qty 14.0 · bid tab
sidewalkSY11$141.00$47.25 to $2,832.00
Bids
  • 2025-12-03 · FDOT (District 2) · T2A53 · $141.00 per SY · qty 1354.0 · bid tab
  • 2025-12-03 · FDOT (District 2) · T2A53 · $108.00 per SY · qty 360.0 · bid tab
  • 2025-08-27 · FDOT (District 2) · T2A35 · $193.00 per SY · qty 32.0 · bid tab
  • 2025-08-27 · FDOT (District 2) · T2A35 · $215.00 per SY · qty 6.0 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $62.26 per SY · qty 492.0 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $118.21 per SY · qty 220.0 · bid tab
  • 2025-01-29 · FDOT (District 2) · T2A14 · $47.25 per SY · qty 198.0 · bid tab
  • 2025-01-29 · FDOT (District 2) · T2A14 · $57.50 per SY · qty 55.0 · bid tab
  • 2024-11-13 · FDOT (District 2) · T2A27 · $2,832.00 per SY · qty 1.0 · bid tab
  • 2024-11-13 · FDOT (District 2) · T2A27 · $513.43 per SY · qty 15.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
storm pipe (diameter not stated)LF11$590.89$230.00 to $800.00
Bids
  • 2025-12-03 · FDOT (District 2) · T2A53 · $531.80 per LF · qty 45.0 · bid tab
  • 2025-12-03 · FDOT (District 2) · T2A53 · $354.54 per LF · qty 42.0 · bid tab
  • 2025-12-03 · FDOT (District 2) · T2A53 · $590.89 per LF · qty 16.0 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $425.00 per LF · qty 79.0 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $628.00 per LF · qty 12.0 · bid tab
  • 2025-04-30 · FDOT (District 2) · T2A28 · $230.00 per LF · qty 368.0 · bid tab
  • 2025-01-29 · FDOT (District 2) · T2A14 · $700.00 per LF · qty 22.0 · bid tab
  • 2025-01-29 · FDOT (District 2) · T2A14 · $600.00 per LF · qty 26.0 · bid tab
  • 2025-01-29 · FDOT (District 2) · T2A14 · $750.00 per LF · qty 4.0 · bid tab
  • 2025-01-29 · FDOT (District 2) · T2A14 · $800.00 per LF · qty 8.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.