Site-work prices, Gilchrist County, FL
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TN | 6 | $169.40 | $164.93 to $549.84 | Bids- 2024-10-30 · FDOT (District 2) · T2A01 · $171.89 per TN · qty 17292.9 · bid tab
- 2024-10-30 · FDOT (District 2) · T2A01 · $549.84 per TN · qty 29.0 · bid tab
- 2024-10-30 · FDOT (District 2) · T2A01 · $166.92 per TN · qty 16375.6 · bid tab
- 2024-02-28 · FDOT (District 2) · T2969 · $164.93 per TN · qty 14664.3 · bid tab
- 2024-02-28 · FDOT (District 2) · T2969 · $166.22 per TN · qty 18029.5 · bid tab
- 2024-02-28 · FDOT (District 2) · T2969 · $520.79 per TN · qty 221.4 · bid tab
|
| curb gutter | LF | 2 | $119.13 | $70.08 to $168.18 | Bids- 2024-10-30 · FDOT (District 2) · T2A01 · $168.18 per LF · qty 76.0 · bid tab
- 2024-02-28 · FDOT (District 2) · T2969 · $70.08 per LF · qty 2637.0 · bid tab
|
| excavation embankment | CY | 1 | $111.07 | $111.07 to $111.07 | Bids- 2024-02-28 · FDOT (District 2) · T2969 · $111.07 per CY · qty 222.5 · bid tab
|
| lime cement stabilization | SY | 1 | $3.82 | $3.82 to $3.82 | Bids- 2024-02-28 · FDOT (District 2) · T2969 · $3.82 per SY · qty 12292.0 · bid tab
|
| sidewalk | SY | 3 | $175.21 | $140.15 to $266.30 | Bids- 2024-10-30 · FDOT (District 2) · T2A01 · $266.30 per SY · qty 15.0 · bid tab
- 2024-10-30 · FDOT (District 2) · T2A01 · $140.15 per SY · qty 206.0 · bid tab
- 2024-02-28 · FDOT (District 2) · T2969 · $175.21 per SY · qty 333.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 4 | $284.62 | $178.98 to $321.43 | Bids- 2024-10-30 · FDOT (District 2) · T2A01 · $321.43 per LF · qty 8.0 · bid tab
- 2024-10-30 · FDOT (District 2) · T2A01 · $178.98 per LF · qty 48.0 · bid tab
- 2024-02-28 · FDOT (District 2) · T2969 · $277.54 per LF · qty 8.0 · bid tab
- 2024-02-28 · FDOT (District 2) · T2969 · $291.70 per LF · qty 9.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.