PadstakeGet the fee reports
Menu

Site-work prices, Bay, Washington County, FL

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTN6$162.81$132.00 to $193.00
Bids
  • 2024-05-22 · FDOT (District 3) · T3922 · $132.00 per TN · qty 4245.8 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $193.00 per TN · qty 10144.4 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $159.00 per TN · qty 8641.1 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $193.00 per TN · qty 1344.7 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $166.61 per TN · qty 409.8 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $132.00 per TN · qty 32859.7 · bid tab
curb gutterLF3$138.31$50.38 to $146.45
Bids
  • 2024-05-22 · FDOT (District 3) · T3922 · $138.31 per LF · qty 20.0 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $146.45 per LF · qty 44.0 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $50.38 per LF · qty 186.0 · bid tab
excavation embankmentCY2$19.88$16.45 to $23.31
Bids
  • 2024-05-22 · FDOT (District 3) · T3922 · $16.45 per CY · qty 773.8 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $23.31 per CY · qty 401.9 · bid tab
excavation embankmentLS1$14,643.92$14,643.92 to $14,643.92
Bids
  • 2024-05-22 · FDOT (District 3) · T3922 · $14,643.92 per LS · qty 1.0 · bid tab
lime cement stabilizationSY1$28.39$28.39 to $28.39
Bids
  • 2024-05-22 · FDOT (District 3) · T3922 · $28.39 per SY · qty 3939.0 · bid tab
manholeEA2$29,752.26$18,355.04 to $41,149.47
Bids
  • 2024-05-22 · FDOT (District 3) · T3922 · $41,149.47 per EA · qty 2.0 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $18,355.04 per EA · qty 6.0 · bid tab
sidewalkSY6$77.41$27.16 to $140.57
Bids
  • 2024-05-22 · FDOT (District 3) · T3922 · $29.92 per SY · qty 291.0 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $27.16 per SY · qty 1403.0 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $118.72 per SY · qty 1503.0 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $36.09 per SY · qty 294.0 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $140.57 per SY · qty 32.0 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $134.43 per SY · qty 114.0 · bid tab
storm pipe (diameter not stated)LF2$388.57$177.48 to $599.67
Bids
  • 2024-05-22 · FDOT (District 3) · T3922 · $177.48 per LF · qty 1932.0 · bid tab
  • 2024-05-22 · FDOT (District 3) · T3922 · $599.67 per LF · qty 16.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.