Site-work prices, Woodruff County, AR
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 8 | $140.25 | $59.40 to $1,300.00 | Bids- 2025-11-05 · ARDOT · A10041 · $120.00 per TON · qty 848.0 · bid tab
- 2025-05-21 · ARDOT · SA7449 · $73.00 per TON · qty 815.0 · bid tab
- 2025-05-21 · ARDOT · SA7449 · $160.50 per TON · qty 55.0 · bid tab
- 2025-01-15 · ARDOT · A10040 · $590.00 per TON · qty 646.0 · bid tab
- 2024-04-10 · ARDOT · SA7448 · $59.40 per TON · qty 1508.0 · bid tab
- 2024-04-10 · ARDOT · SA7448 · $223.08 per TON · qty 18.0 · bid tab
- 2024-02-28 · ARDOT · A10039 · $1,300.00 per TON · qty 176.0 · bid tab
- 2024-02-28 · ARDOT · A10039 · $120.00 per TON · qty 67.0 · bid tab
|
| flexible base | TON | 3 | $36.40 | $34.25 to $70.00 | Bids- 2025-11-05 · ARDOT · A10041 · $36.40 per TON · qty 1505.0 · bid tab
- 2025-01-15 · ARDOT · A10040 · $70.00 per TON · qty 278.0 · bid tab
- 2024-02-28 · ARDOT · A10039 · $34.25 per TON · qty 478.0 · bid tab
|
| lime cement stabilization | TON | 1 | $300.00 | $300.00 to $300.00 | Bids- 2024-02-28 · ARDOT · A10039 · $300.00 per TON · qty 1.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.