Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON20$120.00$36.18 to $400.00
Bids
  • 2026-05-20 · ARDOT · A40052 · $120.00 per TON · qty 387.0 · bid tab
  • 2026-01-21 · ARDOT · A40047 · $120.00 per TON · qty 30.0 · bid tab
  • 2026-01-21 · ARDOT · A40047 · $36.18 per TON · qty 2033.0 · bid tab
  • 2026-01-21 · ARDOT · A40047 · $120.00 per TON · qty 1768.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $400.00 per TON · qty 37.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $120.00 per TON · qty 634.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $120.00 per TON · qty 807.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $120.00 per TON · qty 62.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $120.00 per TON · qty 803.0 · bid tab
  • 2025-05-21 · ARDOT · 040866 · $134.22 per TON · qty 72.0 · bid tab
(10 most recent of 20 shown; all in the Hubstake feed)
concrete pavementSQYD1$139.00$139.00 to $139.00
Bids
  • 2025-10-15 · ARDOT · 040746 · $139.00 per SQYD · qty 2332.48 · bid tab
curb gutterLF4$33.99$23.00 to $203.00
Bids
  • 2025-10-15 · ARDOT · 040746 · $23.00 per LF · qty 32042.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $34.00 per LF · qty 1615.0 · bid tab
  • 2025-01-15 · ARDOT · C72015 · $33.98 per LF · qty 50.0 · bid tab
  • 2024-07-31 · ARDOT · 040854 · $203.00 per LF · qty 103.0 · bid tab
excavation embankmentCUYD6$20.29$3.47 to $1,050.00
Bids
  • 2025-10-15 · ARDOT · 040746 · $24.75 per CUYD · qty 217648.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $14.00 per CUYD · qty 18535.0 · bid tab
  • 2025-05-21 · ARDOT · 040866 · $3.47 per CUYD · qty 81479.0 · bid tab
  • 2025-05-21 · ARDOT · 040866 · $15.83 per CUYD · qty 35756.0 · bid tab
  • 2024-07-31 · ARDOT · 040854 · $243.00 per CUYD · qty 59.0 · bid tab
  • 2024-07-31 · ARDOT · 040854 · $1,050.00 per CUYD · qty 20.0 · bid tab
fire hydrantEACH1$10,980.00$10,980.00 to $10,980.00
Bids
  • 2025-10-15 · ARDOT · 040746 · $10,980.00 per EACH · qty 26.0 · bid tab
flexible baseTON12$54.08$31.69 to $2,030.00
Bids
  • 2026-01-21 · ARDOT · A40047 · $42.04 per TON · qty 1337.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $109.00 per TON · qty 18321.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $50.00 per TON · qty 3181.0 · bid tab
  • 2025-05-21 · ARDOT · 040866 · $31.69 per TON · qty 12733.0 · bid tab
  • 2025-02-26 · ARDOT · A40041 · $40.00 per TON · qty 1834.0 · bid tab
  • 2025-01-15 · ARDOT · C72015 · $54.15 per TON · qty 828.0 · bid tab
  • 2025-01-15 · ARDOT · SA72A2 · $36.13 per TON · qty 483.0 · bid tab
  • 2024-07-31 · ARDOT · 040854 · $2,030.00 per TON · qty 3.0 · bid tab
  • 2024-05-22 · ARDOT · A40031 · $70.00 per TON · qty 1088.0 · bid tab
  • 2024-02-28 · ARDOT · SA72A1 · $54.00 per TON · qty 854.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
inlet headwallEACH3$1,467.28$955.23 to $2,030.00
Bids
  • 2025-10-15 · ARDOT · 040746 · $1,467.28 per EACH · qty 11.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $955.23 per EACH · qty 110.0 · bid tab
  • 2024-07-31 · ARDOT · 040854 · $2,030.00 per EACH · qty 2.0 · bid tab
lime cement stabilizationTON4$248.44$47.72 to $741.62
Bids
  • 2025-10-15 · ARDOT · 040746 · $741.62 per TON · qty 100.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $47.72 per TON · qty 47.0 · bid tab
  • 2025-05-21 · ARDOT · 040866 · $424.88 per TON · qty 100.0 · bid tab
  • 2025-05-21 · ARDOT · 040866 · $71.99 per TON · qty 39.0 · bid tab
manholeEACH5$7,792.00$2,744.43 to $18,595.00
Bids
  • 2025-10-15 · ARDOT · 040746 · $18,595.00 per EACH · qty 1.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $7,792.00 per EACH · qty 28.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $2,744.43 per EACH · qty 5.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $3,442.02 per EACH · qty 4.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $11,375.10 per EACH · qty 1.0 · bid tab
sewer main 8-inchLF2$98.30$53.60 to $143.00
Bids
  • 2025-10-15 · ARDOT · 040746 · $53.60 per LF · qty 3100.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $143.00 per LF · qty 600.0 · bid tab
sewer main (diameter not stated)LF3$85.74$51.33 to $91.28
Bids
  • 2025-10-15 · ARDOT · 040746 · $91.28 per LF · qty 30.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $51.33 per LF · qty 2528.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $85.74 per LF · qty 490.0 · bid tab
sewer serviceEACH1$1,775.75$1,775.75 to $1,775.75
Bids
  • 2025-10-15 · ARDOT · 040746 · $1,775.75 per EACH · qty 12.0 · bid tab
sewer serviceLF1$40.20$40.20 to $40.20
Bids
  • 2025-10-15 · ARDOT · 040746 · $40.20 per LF · qty 160.0 · bid tab
storm pipe 18-inchLF5$87.00$75.96 to $406.00
Bids
  • 2025-10-15 · ARDOT · 040746 · $214.81 per LF · qty 180.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $75.96 per LF · qty 7110.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $87.00 per LF · qty 580.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $82.71 per LF · qty 284.0 · bid tab
  • 2024-07-31 · ARDOT · 040854 · $406.00 per LF · qty 10.0 · bid tab
storm pipe 20-inchLF1$304.51$304.51 to $304.51
Bids
  • 2025-10-15 · ARDOT · 040746 · $304.51 per LF · qty 410.0 · bid tab
storm pipe 24-inchLF3$168.00$87.18 to $387.81
Bids
  • 2025-10-15 · ARDOT · 040746 · $387.81 per LF · qty 180.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $87.18 per LF · qty 991.0 · bid tab
  • 2025-05-21 · ARDOT · 040866 · $168.00 per LF · qty 34.0 · bid tab
storm pipe 30-inchLF4$129.45$119.55 to $255.88
Bids
  • 2025-10-15 · ARDOT · 040746 · $119.60 per LF · qty 666.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $255.88 per LF · qty 78.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $119.55 per LF · qty 30.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $139.30 per LF · qty 34.0 · bid tab
storm pipe 36-inchLF4$179.99$170.00 to $541.00
Bids
  • 2025-10-15 · ARDOT · 040746 · $189.97 per LF · qty 738.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $170.00 per LF · qty 108.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $170.00 per LF · qty 808.0 · bid tab
  • 2024-07-31 · ARDOT · 040854 · $541.00 per LF · qty 42.0 · bid tab
storm pipe 42-inchLF2$209.07$205.44 to $212.70
Bids
  • 2025-10-15 · ARDOT · 040746 · $205.44 per LF · qty 74.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $212.70 per LF · qty 662.0 · bid tab
storm pipe 44-inchLF2$197.35$192.92 to $201.79
Bids
  • 2025-10-15 · ARDOT · 040746 · $201.79 per LF · qty 50.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $192.92 per LF · qty 146.0 · bid tab
storm pipe 48-inchLF1$235.80$235.80 to $235.80
Bids
  • 2025-10-15 · ARDOT · 040746 · $235.80 per LF · qty 118.0 · bid tab
storm pipe 51-inchLF1$236.86$236.86 to $236.86
Bids
  • 2025-10-15 · ARDOT · 040746 · $236.86 per LF · qty 192.0 · bid tab
storm pipe 54-inchLF3$285.22$285.20 to $836.53
Bids
  • 2025-10-15 · ARDOT · 040746 · $285.20 per LF · qty 980.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $836.53 per LF · qty 130.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $285.22 per LF · qty 126.0 · bid tab
storm pipe 59-inchLF1$236.86$236.86 to $236.86
Bids
  • 2025-10-15 · ARDOT · 040746 · $236.86 per LF · qty 36.0 · bid tab
storm pipe 60-inchLF3$337.69$328.46 to $356.26
Bids
  • 2025-10-15 · ARDOT · 040746 · $328.46 per LF · qty 360.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $356.26 per LF · qty 144.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $337.69 per LF · qty 716.0 · bid tab
water main (diameter not stated)LF2$442.75$117.50 to $768.00
Bids
  • 2025-10-15 · ARDOT · 040746 · $768.00 per LF · qty 3050.0 · bid tab
  • 2025-10-15 · ARDOT · 040746 · $117.50 per LF · qty 10700.0 · bid tab
water serviceEACH1$866.00$866.00 to $866.00
Bids
  • 2025-10-15 · ARDOT · 040746 · $866.00 per EACH · qty 25.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.