PadstakeGet the fee reports
Menu

Site-work prices, Sevier County, AR

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON4$154.50$118.80 to $250.00
Bids
  • 2026-05-20 · ARDOT · SA6651 · $118.80 per TON · qty 1334.0 · bid tab
  • 2025-04-09 · ARDOT · SA6650 · $250.00 per TON · qty 125.0 · bid tab
  • 2024-04-10 · ARDOT · SA6648 · $172.00 per TON · qty 170.0 · bid tab
  • 2024-01-17 · ARDOT · SA6647 · $137.00 per TON · qty 922.0 · bid tab
flexible baseTON2$77.50$65.00 to $90.00
Bids
  • 2025-04-09 · ARDOT · SA6650 · $90.00 per TON · qty 40.0 · bid tab
  • 2024-04-10 · ARDOT · SA6648 · $65.00 per TON · qty 290.0 · bid tab
lime cement stabilizationTON1$2,500.00$2,500.00 to $2,500.00
Bids
  • 2025-04-09 · ARDOT · SA6650 · $2,500.00 per TON · qty 1.0 · bid tab
storm pipe 17-inchLF1$390.00$390.00 to $390.00
Bids
  • 2025-04-09 · ARDOT · SA6650 · $390.00 per LF · qty 180.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.