| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 30 | $120.00 | $30.00 to $220.00 | Bids- 2026-04-08 · ARDOT · C65018 · $120.00 per TON · qty 467.0 · bid tab
- 2026-03-04 · ARDOT · SA6552 · $30.00 per TON · qty 947.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $120.00 per TON · qty 11.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $120.00 per TON · qty 24.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $120.00 per TON · qty 5.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $120.00 per TON · qty 9.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $120.00 per TON · qty 44.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $120.00 per TON · qty 43.0 · bid tab
- 2025-04-09 · ARDOT · A40030 · $127.80 per TON · qty 307.0 · bid tab
- 2025-04-09 · ARDOT · A40030 · $127.80 per TON · qty 9.0 · bid tab
(10 most recent of 30 shown; all in the Hubstake feed) |
| concrete pavement | SQYD | 3 | $150.00 | $69.00 to $150.00 | Bids- 2025-09-17 · ARDOT · 040889 · $150.00 per SQYD · qty 1515.0 · bid tab
- 2025-04-09 · ARDOT · A40030 · $150.00 per SQYD · qty 1000.0 · bid tab
- 2025-04-09 · ARDOT · A40030 · $69.00 per SQYD · qty 46916.0 · bid tab
|
| curb gutter | LF | 2 | $68.10 | $46.00 to $90.21 | Bids- 2025-09-17 · ARDOT · 040889 · $46.00 per LF · qty 1336.0 · bid tab
- 2025-04-09 · ARDOT · A40030 · $90.21 per LF · qty 200.0 · bid tab
|
| excavation embankment | CUYD | 8 | $18.25 | $7.88 to $24.35 | Bids- 2025-09-17 · ARDOT · 040889 · $18.50 per CUYD · qty 4092.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $24.35 per CUYD · qty 9568.0 · bid tab
- 2024-09-18 · ARDOT · 040792 · $18.50 per CUYD · qty 31461.0 · bid tab
- 2024-09-18 · ARDOT · 040792 · $18.50 per CUYD · qty 28617.0 · bid tab
- 2024-07-31 · ARDOT · 040793 · $14.00 per CUYD · qty 26762.0 · bid tab
- 2024-07-31 · ARDOT · 040793 · $18.00 per CUYD · qty 29660.0 · bid tab
- 2024-01-17 · ARDOT · 040781 · $16.80 per CUYD · qty 39101.0 · bid tab
- 2024-01-17 · ARDOT · 040781 · $7.88 per CUYD · qty 13793.0 · bid tab
|
| flexible base | TON | 9 | $45.50 | $33.60 to $149.65 | Bids- 2025-09-17 · ARDOT · 040889 · $54.65 per TON · qty 791.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $149.65 per TON · qty 1442.0 · bid tab
- 2025-04-09 · ARDOT · A40030 · $48.99 per TON · qty 327.0 · bid tab
- 2025-02-26 · ARDOT · A40040 · $36.50 per TON · qty 1471.0 · bid tab
- 2024-09-18 · ARDOT · 040792 · $38.00 per TON · qty 12748.0 · bid tab
- 2024-07-31 · ARDOT · 040793 · $34.00 per TON · qty 5775.0 · bid tab
- 2024-02-28 · ARDOT · C65017 · $45.50 per TON · qty 978.0 · bid tab
- 2024-01-17 · ARDOT · 040781 · $33.60 per TON · qty 14430.0 · bid tab
- 2024-01-17 · ARDOT · A40029 · $69.00 per TON · qty 2324.0 · bid tab
|
| inlet headwall | EACH | 2 | $2,360.00 | $1,765.00 to $2,955.00 | Bids- 2025-09-17 · ARDOT · 040889 · $1,765.00 per EACH · qty 9.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $2,955.00 per EACH · qty 2.0 · bid tab
|
| lime cement stabilization | SQYD | 1 | $14.00 | $14.00 to $14.00 | Bids- 2025-09-17 · ARDOT · 040889 · $14.00 per SQYD · qty 1724.0 · bid tab
|
| lime cement stabilization | TON | 10 | $160.68 | $38.50 to $550.00 | Bids- 2025-09-17 · ARDOT · 040889 · $47.25 per TON · qty 13.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $200.00 per TON · qty 100.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $300.00 per TON · qty 21.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $121.35 per TON · qty 567.0 · bid tab
- 2024-09-18 · ARDOT · 040792 · $88.50 per TON · qty 36.0 · bid tab
- 2024-09-18 · ARDOT · 040792 · $550.00 per TON · qty 100.0 · bid tab
- 2024-07-31 · ARDOT · 040793 · $38.50 per TON · qty 16.0 · bid tab
- 2024-07-31 · ARDOT · 040793 · $500.00 per TON · qty 25.0 · bid tab
- 2024-01-17 · ARDOT · 040781 · $68.25 per TON · qty 9.0 · bid tab
- 2024-01-17 · ARDOT · 040781 · $262.50 per TON · qty 50.0 · bid tab
|
| manhole | EACH | 1 | $11,200.00 | $11,200.00 to $11,200.00 | Bids- 2025-09-17 · ARDOT · 040889 · $11,200.00 per EACH · qty 1.0 · bid tab
|
| storm pipe 18-inch | LF | 2 | $72.60 | $60.00 to $85.20 | Bids- 2025-09-17 · ARDOT · 040889 · $60.00 per LF · qty 113.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $85.20 per LF · qty 52.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $96.00 | $96.00 to $96.00 | Bids- 2025-09-17 · ARDOT · 040889 · $96.00 per LF · qty 310.0 · bid tab
|
| storm pipe 36-inch | LF | 2 | $147.00 | $115.00 to $179.00 | Bids- 2025-09-17 · ARDOT · 040889 · $115.00 per LF · qty 95.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $179.00 per LF · qty 78.0 · bid tab
|
| storm pipe 42-inch | LF | 1 | $180.00 | $180.00 to $180.00 | Bids- 2025-09-17 · ARDOT · 040889 · $180.00 per LF · qty 43.0 · bid tab
|
| storm pipe 48-inch | LF | 3 | $253.20 | $180.00 to $336.00 | Bids- 2025-09-17 · ARDOT · 040889 · $180.00 per LF · qty 213.0 · bid tab
- 2025-09-17 · ARDOT · 040889 · $253.20 per LF · qty 149.0 · bid tab
- 2024-01-17 · ARDOT · 040781 · $336.00 per LF · qty 88.0 · bid tab
|