Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON13$120.00$113.83 to $680.00
Bids
  • 2026-03-04 · ARDOT · A90038 · $120.00 per TON · qty 2051.0 · bid tab
  • 2026-03-04 · ARDOT · A90038 · $120.00 per TON · qty 269.0 · bid tab
  • 2026-03-04 · ARDOT · A90038 · $113.83 per TON · qty 108.0 · bid tab
  • 2025-11-05 · ARDOT · 090672 · $120.00 per TON · qty 35.0 · bid tab
  • 2025-11-05 · ARDOT · 090672 · $120.00 per TON · qty 76.0 · bid tab
  • 2025-11-05 · ARDOT · 090672 · $425.00 per TON · qty 30.0 · bid tab
  • 2025-11-05 · ARDOT · 090672 · $120.00 per TON · qty 10.0 · bid tab
  • 2025-11-05 · ARDOT · A90041 · $120.00 per TON · qty 18.0 · bid tab
  • 2025-11-05 · ARDOT · A90041 · $120.00 per TON · qty 1201.0 · bid tab
  • 2025-05-21 · ARDOT · SA6447 · $120.00 per TON · qty 135.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
curb gutterLF1$30.00$30.00 to $30.00
Bids
  • 2025-11-05 · ARDOT · 090672 · $30.00 per LF · qty 2926.0 · bid tab
excavation embankmentCUYD4$34.80$18.00 to $48.39
Bids
  • 2026-03-04 · ARDOT · A90038 · $48.39 per CUYD · qty 15.0 · bid tab
  • 2026-03-04 · ARDOT · A90038 · $34.59 per CUYD · qty 270.0 · bid tab
  • 2025-11-05 · ARDOT · 090672 · $18.00 per CUYD · qty 11267.0 · bid tab
  • 2025-11-05 · ARDOT · 090672 · $35.00 per CUYD · qty 1242.0 · bid tab
fire hydrantEACH1$2,500.00$2,500.00 to $2,500.00
Bids
  • 2025-11-05 · ARDOT · 090672 · $2,500.00 per EACH · qty 1.0 · bid tab
flexible baseSTA1$124.44$124.44 to $124.44
Bids
  • 2025-05-21 · ARDOT · SA6447 · $124.44 per STA · qty 94.0 · bid tab
flexible baseTON4$29.00$24.92 to $55.81
Bids
  • 2026-03-04 · ARDOT · A90038 · $24.92 per TON · qty 2505.0 · bid tab
  • 2025-11-05 · ARDOT · 090672 · $30.00 per TON · qty 2307.0 · bid tab
  • 2025-11-05 · ARDOT · A90041 · $28.00 per TON · qty 500.0 · bid tab
  • 2024-02-28 · ARDOT · C64006 · $55.81 per TON · qty 621.0 · bid tab
inlet headwallEACH2$2,000.00$1,500.00 to $2,500.00
Bids
  • 2025-11-05 · ARDOT · 090672 · $2,500.00 per EACH · qty 2.0 · bid tab
  • 2025-11-05 · ARDOT · 090672 · $1,500.00 per EACH · qty 15.0 · bid tab
lime cement stabilizationTON3$95.00$5.00 to $95.00
Bids
  • 2026-03-04 · ARDOT · A90038 · $95.00 per TON · qty 10.0 · bid tab
  • 2025-11-05 · ARDOT · 090672 · $95.00 per TON · qty 2.0 · bid tab
  • 2025-11-05 · ARDOT · 090672 · $5.00 per TON · qty 100.0 · bid tab
manholeEACH2$6,250.00$4,000.00 to $8,500.00
Bids
  • 2025-11-05 · ARDOT · 090672 · $4,000.00 per EACH · qty 8.0 · bid tab
  • 2025-11-05 · ARDOT · 090672 · $8,500.00 per EACH · qty 7.0 · bid tab
sewer main 8-inchLF1$78.00$78.00 to $78.00
Bids
  • 2025-11-05 · ARDOT · 090672 · $78.00 per LF · qty 520.0 · bid tab
sewer serviceLF1$32.00$32.00 to $32.00
Bids
  • 2025-11-05 · ARDOT · 090672 · $32.00 per LF · qty 340.0 · bid tab
storm pipe 24-inchLF2$118.00$108.92 to $127.07
Bids
  • 2026-03-04 · ARDOT · A90038 · $108.92 per LF · qty 55.0 · bid tab
  • 2026-03-04 · ARDOT · A90038 · $127.07 per LF · qty 200.0 · bid tab
storm pipe 36-inchLF1$318.96$318.96 to $318.96
Bids
  • 2026-03-04 · ARDOT · A90038 · $318.96 per LF · qty 40.0 · bid tab
storm pipe 48-inchLF1$443.33$443.33 to $443.33
Bids
  • 2026-03-04 · ARDOT · A90038 · $443.33 per LF · qty 40.0 · bid tab
storm pipe 59-inchLF2$375.00$375.00 to $375.00
Bids
  • 2025-11-05 · ARDOT · 090672 · $375.00 per LF · qty 120.0 · bid tab
  • 2025-11-05 · ARDOT · 090672 · $375.00 per LF · qty 142.0 · bid tab
water main 2-inchLF1$28.00$28.00 to $28.00
Bids
  • 2025-11-05 · ARDOT · 090672 · $28.00 per LF · qty 280.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.