| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 6 | $120.00 | $120.00 to $600.00 | Bids- 2025-04-09 · ARDOT · SA6258 · $120.00 per TON · qty 108.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $120.00 per TON · qty 846.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $120.00 per TON · qty 7.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $120.00 per TON · qty 9.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $600.00 per TON · qty 139.0 · bid tab
- 2025-01-15 · ARDOT · A60042 · $120.00 per TON · qty 1321.0 · bid tab
|
| concrete pavement | SQYD | 4 | $120.00 | $13.14 to $165.00 | Bids- 2025-02-26 · ARDOT · 061708 · $120.00 per SQYD · qty 167.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $165.00 per SQYD · qty 2217.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $120.00 per SQYD · qty 5819.0 · bid tab
- 2025-01-15 · ARDOT · A60042 · $13.14 per SQYD · qty 1516.0 · bid tab
|
| curb gutter | LF | 2 | $31.27 | $28.53 to $34.00 | Bids- 2025-02-26 · ARDOT · 061708 · $34.00 per LF · qty 13656.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $28.53 per LF · qty 2262.0 · bid tab
|
| excavation embankment | CUYD | 2 | $55.05 | $54.19 to $55.92 | Bids- 2025-02-26 · ARDOT · 061708 · $55.92 per CUYD · qty 16232.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $54.19 per CUYD · qty 11102.0 · bid tab
|
| flexible base | TON | 1 | $46.70 | $46.70 to $46.70 | Bids- 2025-02-26 · ARDOT · 061708 · $46.70 per TON · qty 23121.0 · bid tab
|
| inlet headwall | EACH | 2 | $2,677.19 | $2,131.60 to $3,222.78 | Bids- 2025-02-26 · ARDOT · 061708 · $3,222.78 per EACH · qty 8.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $2,131.60 per EACH · qty 44.0 · bid tab
|
| lime cement stabilization | SQYD | 1 | $2.75 | $2.75 to $2.75 | Bids- 2025-02-26 · ARDOT · 061708 · $2.75 per SQYD · qty 2621.0 · bid tab
|
| lime cement stabilization | TON | 4 | $143.88 | $100.00 to $637.48 | Bids- 2025-02-26 · ARDOT · 061708 · $143.81 per TON · qty 862.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $637.48 per TON · qty 100.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $143.94 per TON · qty 55.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $100.00 per TON · qty 10.0 · bid tab
|
| manhole | EACH | 2 | $7,295.59 | $6,398.46 to $8,192.72 | Bids- 2025-02-26 · ARDOT · 061708 · $8,192.72 per EACH · qty 7.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $6,398.46 per EACH · qty 1.0 · bid tab
|
| storm pipe 18-inch | LF | 3 | $95.35 | $85.07 to $104.67 | Bids- 2025-02-26 · ARDOT · 061708 · $85.07 per LF · qty 265.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $104.67 per LF · qty 2324.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $95.35 per LF · qty 3013.0 · bid tab
|
| storm pipe 24-inch | LF | 2 | $192.62 | $139.90 to $245.33 | Bids- 2025-02-26 · ARDOT · 061708 · $139.90 per LF · qty 801.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $245.33 per LF · qty 133.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $352.14 | $171.14 to $533.14 | Bids- 2025-02-26 · ARDOT · 061708 · $171.14 per LF · qty 1111.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $533.14 per LF · qty 128.0 · bid tab
|
| storm pipe 36-inch | LF | 2 | $376.69 | $262.35 to $491.03 | Bids- 2025-02-26 · ARDOT · 061708 · $491.03 per LF · qty 96.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $262.35 per LF · qty 294.0 · bid tab
|
| storm pipe 42-inch | LF | 1 | $507.70 | $507.70 to $507.70 | Bids- 2025-02-26 · ARDOT · 061708 · $507.70 per LF · qty 10.0 · bid tab
|
| storm pipe 48-inch | LF | 2 | $1,579.10 | $1,561.20 to $1,596.99 | Bids- 2025-02-26 · ARDOT · 061708 · $1,561.20 per LF · qty 8.0 · bid tab
- 2025-02-26 · ARDOT · 061708 · $1,596.99 per LF · qty 40.0 · bid tab
|