Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON17$741.42$120.00 to $1,450.00
Bids
  • 2026-06-24 · ARDOT · SA4348 · $120.00 per TON · qty 420.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $741.42 per TON · qty 111.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $241.69 per TON · qty 211.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $741.42 per TON · qty 447.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $741.42 per TON · qty 582.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $847.34 per TON · qty 819.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $582.55 per TON · qty 28.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $582.55 per TON · qty 54.0 · bid tab
  • 2025-09-17 · ARDOT · SA4347 · $800.00 per TON · qty 340.0 · bid tab
  • 2025-06-25 · ARDOT · 061745 · $650.00 per TON · qty 85.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed)
concrete pavementSQYD2$137.77$129.68 to $145.86
Bids
  • 2026-01-21 · ARDOT · 061371 · $129.68 per SQYD · qty 481.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $145.86 per SQYD · qty 14479.0 · bid tab
curb gutterLF2$66.25$38.40 to $94.10
Bids
  • 2026-01-21 · ARDOT · 061371 · $94.10 per LF · qty 99.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $38.40 per LF · qty 13119.0 · bid tab
excavation embankmentCUYD5$24.50$19.35 to $250.00
Bids
  • 2026-01-21 · ARDOT · 061371 · $19.35 per CUYD · qty 85864.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $24.50 per CUYD · qty 420794.0 · bid tab
  • 2025-06-25 · ARDOT · 061745 · $35.94 per CUYD · qty 14886.0 · bid tab
  • 2025-06-25 · ARDOT · 061745 · $23.12 per CUYD · qty 4320.0 · bid tab
  • 2024-01-17 · ARDOT · C43011 · $250.00 per CUYD · qty 16.0 · bid tab
flexible baseTON11$43.20$35.00 to $320.00
Bids
  • 2026-06-24 · ARDOT · SA4348 · $37.50 per TON · qty 612.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $65.67 per TON · qty 12959.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $49.07 per TON · qty 28845.0 · bid tab
  • 2025-09-17 · ARDOT · SA4347 · $35.00 per TON · qty 906.0 · bid tab
  • 2025-06-25 · ARDOT · 061745 · $44.89 per TON · qty 3869.0 · bid tab
  • 2025-02-26 · ARDOT · A60048 · $43.20 per TON · qty 4301.0 · bid tab
  • 2024-04-10 · ARDOT · SA4346 · $38.00 per TON · qty 482.0 · bid tab
  • 2024-02-28 · ARDOT · C43012 · $39.00 per TON · qty 979.0 · bid tab
  • 2024-01-17 · ARDOT · A60036 · $42.00 per TON · qty 779.0 · bid tab
  • 2024-01-17 · ARDOT · C43011 · $50.00 per TON · qty 378.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
inlet headwallEACH2$2,459.06$1,652.13 to $3,265.98
Bids
  • 2026-01-21 · ARDOT · 061371 · $1,652.13 per EACH · qty 48.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $3,265.98 per EACH · qty 1.0 · bid tab
lime cement stabilizationSQYD1$15.78$15.78 to $15.78
Bids
  • 2026-01-21 · ARDOT · 061371 · $15.78 per SQYD · qty 16476.0 · bid tab
lime cement stabilizationTON7$100.00$32.87 to $331.23
Bids
  • 2026-01-21 · ARDOT · 061371 · $32.87 per TON · qty 5421.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $239.65 per TON · qty 346.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $331.23 per TON · qty 1500.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $78.75 per TON · qty 51.0 · bid tab
  • 2025-06-25 · ARDOT · 061745 · $85.00 per TON · qty 8.0 · bid tab
  • 2025-06-25 · ARDOT · 061745 · $323.98 per TON · qty 100.0 · bid tab
  • 2024-01-17 · ARDOT · A60036 · $100.00 per TON · qty 10.0 · bid tab
manholeEACH2$4,795.12$3,098.34 to $6,491.90
Bids
  • 2026-01-21 · ARDOT · 061371 · $6,491.90 per EACH · qty 5.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $3,098.34 per EACH · qty 18.0 · bid tab
storm pipe 18-inchLF3$108.65$76.85 to $108.66
Bids
  • 2026-01-21 · ARDOT · 061371 · $108.66 per LF · qty 1435.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $108.65 per LF · qty 3845.0 · bid tab
  • 2025-06-25 · ARDOT · 061745 · $76.85 per LF · qty 54.0 · bid tab
storm pipe 24-inchLF3$161.45$94.87 to $161.45
Bids
  • 2026-01-21 · ARDOT · 061371 · $161.45 per LF · qty 471.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $161.45 per LF · qty 1509.0 · bid tab
  • 2025-06-25 · ARDOT · 061745 · $94.87 per LF · qty 56.0 · bid tab
storm pipe 30-inchLF2$152.37$152.33 to $152.41
Bids
  • 2026-01-21 · ARDOT · 061371 · $152.33 per LF · qty 19.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $152.41 per LF · qty 137.0 · bid tab
storm pipe 36-inchLF4$201.08$193.21 to $365.00
Bids
  • 2026-01-21 · ARDOT · 061371 · $208.95 per LF · qty 447.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $193.21 per LF · qty 8.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $193.22 per LF · qty 197.0 · bid tab
  • 2024-02-28 · ARDOT · C43012 · $365.00 per LF · qty 4.0 · bid tab
storm pipe 42-inchLF3$280.10$280.07 to $464.43
Bids
  • 2026-01-21 · ARDOT · 061371 · $280.10 per LF · qty 460.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $280.07 per LF · qty 13.0 · bid tab
  • 2026-01-21 · ARDOT · 061371 · $464.43 per LF · qty 205.0 · bid tab
storm pipe 44-inchLF1$280.93$280.93 to $280.93
Bids
  • 2026-01-21 · ARDOT · 061371 · $280.93 per LF · qty 145.0 · bid tab
storm pipe 48-inchLF1$281.60$281.60 to $281.60
Bids
  • 2026-01-21 · ARDOT · 061371 · $281.60 per LF · qty 312.0 · bid tab
storm pipe 51-inchLF1$265.24$265.24 to $265.24
Bids
  • 2026-01-21 · ARDOT · 061371 · $265.24 per LF · qty 153.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.