Site-work prices, Logan County, AR
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 12 | $120.00 | $48.00 to $2,000.00 | Bids- 2026-04-08 · ARDOT · A80045 · $120.00 per TON · qty 46.0 · bid tab
- 2026-04-08 · ARDOT · A80045 · $2,000.00 per TON · qty 134.0 · bid tab
- 2026-04-08 · ARDOT · A80045 · $120.00 per TON · qty 2150.0 · bid tab
- 2026-01-21 · ARDOT · C42007 · $120.00 per TON · qty 288.0 · bid tab
- 2026-01-21 · ARDOT · SA4284 · $120.00 per TON · qty 55.0 · bid tab
- 2026-01-21 · ARDOT · SA4284 · $48.00 per TON · qty 727.0 · bid tab
- 2025-02-26 · ARDOT · SA4283 · $120.00 per TON · qty 37.0 · bid tab
- 2025-02-26 · ARDOT · SA4283 · $73.60 per TON · qty 876.0 · bid tab
- 2024-01-17 · ARDOT · A80034 · $131.22 per TON · qty 591.0 · bid tab
- 2024-01-17 · ARDOT · A80034 · $131.22 per TON · qty 6.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed) |
| excavation embankment | CUYD | 2 | $72.50 | $70.00 to $75.00 | Bids- 2026-04-08 · ARDOT · A80045 · $70.00 per CUYD · qty 509.0 · bid tab
- 2026-04-08 · ARDOT · A80045 · $75.00 per CUYD · qty 104.0 · bid tab
|
| flexible base | TON | 2 | $47.25 | $45.00 to $49.50 | Bids- 2026-04-08 · ARDOT · A80045 · $45.00 per TON · qty 1148.0 · bid tab
- 2026-01-21 · ARDOT · C42007 · $49.50 per TON · qty 3504.0 · bid tab
|
| lime cement stabilization | TON | 1 | $85.00 | $85.00 to $85.00 | Bids- 2026-04-08 · ARDOT · A80045 · $85.00 per TON · qty 2.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.