Site-work prices, Lincoln County, AR
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 8 | $600.00 | $94.00 to $1,100.00 | Bids- 2026-06-24 · ARDOT · SA4051 · $120.00 per TON · qty 211.0 · bid tab
- 2025-05-21 · ARDOT · SA4050 · $199.00 per TON · qty 31.0 · bid tab
- 2025-05-21 · ARDOT · SA4050 · $94.00 per TON · qty 884.0 · bid tab
- 2024-04-10 · ARDOT · 020778 · $700.00 per TON · qty 6.0 · bid tab
- 2024-04-10 · ARDOT · 020778 · $700.00 per TON · qty 26.0 · bid tab
- 2024-02-28 · ARDOT · A20029 · $1,100.00 per TON · qty 1869.0 · bid tab
- 2024-02-28 · ARDOT · A20029 · $500.00 per TON · qty 31.0 · bid tab
- 2024-02-28 · ARDOT · A20029 · $1,100.00 per TON · qty 516.0 · bid tab
|
| excavation embankment | CUYD | 2 | $21.50 | $18.00 to $25.00 | Bids- 2024-04-10 · ARDOT · 020778 · $25.00 per CUYD · qty 1731.0 · bid tab
- 2024-04-10 · ARDOT · 020778 · $18.00 per CUYD · qty 2726.0 · bid tab
|
| flexible base | TON | 2 | $72.50 | $65.00 to $80.00 | Bids- 2024-04-10 · ARDOT · 020778 · $65.00 per TON · qty 1951.0 · bid tab
- 2024-02-28 · ARDOT · A20029 · $80.00 per TON · qty 1911.0 · bid tab
|
| lime cement stabilization | TON | 2 | $197.50 | $195.00 to $200.00 | Bids- 2024-04-10 · ARDOT · 020778 · $200.00 per TON · qty 250.0 · bid tab
- 2024-04-10 · ARDOT · 020778 · $195.00 per TON · qty 4.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $400.00 | $400.00 to $400.00 | Bids- 2024-02-28 · ARDOT · A20029 · $400.00 per LF · qty 96.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.