Site-work prices, Lee, Monroe County, AR
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|---|---|---|---|---|
| asphalt pavement | TON | 3 | $130.00 | $120.00 to $130.00 | |
| excavation embankment | CUYD | 2 | $45.00 | $40.00 to $50.00 | |
| flexible base | TON | 2 | $64.03 | $63.05 to $65.00 | |
| lime cement stabilization | TON | 2 | $227.50 | $105.00 to $350.00 | |
| storm pipe 48-inch | LF | 1 | $550.00 | $550.00 to $550.00 | Bids
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.