Site-work prices, Jefferson County, AR

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON17$195.00$120.00 to $1,230.00
Bids
  • 2026-05-20 · ARDOT · 020802 · $195.00 per TON · qty 19.0 · bid tab
  • 2026-05-20 · ARDOT · 020802 · $1,095.00 per TON · qty 94.0 · bid tab
  • 2026-03-04 · ARDOT · A20037 · $120.00 per TON · qty 1435.0 · bid tab
  • 2026-01-21 · ARDOT · SA3550 · $120.00 per TON · qty 254.0 · bid tab
  • 2025-08-13 · ARDOT · 020628 · $120.00 per TON · qty 556.0 · bid tab
  • 2025-08-13 · ARDOT · 020628 · $1,200.00 per TON · qty 193.0 · bid tab
  • 2025-08-13 · ARDOT · 020628 · $120.00 per TON · qty 57.0 · bid tab
  • 2025-08-13 · ARDOT · 020628 · $724.57 per TON · qty 140.0 · bid tab
  • 2025-04-09 · ARDOT · A20034 · $120.00 per TON · qty 2001.0 · bid tab
  • 2024-05-22 · ARDOT · 020784 · $1,210.00 per TON · qty 51.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed)
curb gutterLF1$35.71$35.71 to $35.71
Bids
  • 2025-08-13 · ARDOT · 020628 · $35.71 per LF · qty 14808.0 · bid tab
excavation embankmentCUYD7$34.00$15.00 to $280.81
Bids
  • 2026-05-20 · ARDOT · 020802 · $15.00 per CUYD · qty 1270.0 · bid tab
  • 2026-05-20 · ARDOT · 020802 · $20.00 per CUYD · qty 7254.0 · bid tab
  • 2025-08-13 · ARDOT · 020628 · $61.24 per CUYD · qty 16712.0 · bid tab
  • 2025-08-13 · ARDOT · 020628 · $62.66 per CUYD · qty 4458.0 · bid tab
  • 2025-04-09 · ARDOT · A20034 · $280.81 per CUYD · qty 20.0 · bid tab
  • 2024-05-22 · ARDOT · 020784 · $34.00 per CUYD · qty 11815.0 · bid tab
  • 2024-05-22 · ARDOT · 020784 · $25.00 per CUYD · qty 16335.0 · bid tab
flexible baseTON10$57.09$40.00 to $178.67
Bids
  • 2026-05-20 · ARDOT · 020802 · $40.00 per TON · qty 5176.0 · bid tab
  • 2026-03-04 · ARDOT · A20037 · $48.57 per TON · qty 1638.0 · bid tab
  • 2026-01-21 · ARDOT · SA3550 · $45.00 per TON · qty 444.0 · bid tab
  • 2025-08-13 · ARDOT · 020628 · $178.67 per TON · qty 1379.0 · bid tab
  • 2025-08-13 · ARDOT · 020628 · $55.07 per TON · qty 7958.0 · bid tab
  • 2025-04-09 · ARDOT · A20034 · $45.83 per TON · qty 1460.0 · bid tab
  • 2024-05-22 · ARDOT · 020784 · $75.00 per TON · qty 7266.0 · bid tab
  • 2024-05-22 · ARDOT · SA3549 · $59.11 per TON · qty 301.0 · bid tab
  • 2024-01-17 · ARDOT · C35007 · $89.20 per TON · qty 1176.0 · bid tab
  • 2024-01-17 · ARDOT · C35009 · $91.53 per TON · qty 244.0 · bid tab
inlet headwallEACH2$3,023.80$2,410.26 to $3,637.33
Bids
  • 2025-08-13 · ARDOT · 020628 · $2,410.26 per EACH · qty 15.0 · bid tab
  • 2025-08-13 · ARDOT · 020628 · $3,637.33 per EACH · qty 5.0 · bid tab
lime cement stabilizationTON6$111.34$100.00 to $560.32
Bids
  • 2026-05-20 · ARDOT · 020802 · $112.00 per TON · qty 4.0 · bid tab
  • 2026-05-20 · ARDOT · 020802 · $100.00 per TON · qty 75.0 · bid tab
  • 2025-08-13 · ARDOT · 020628 · $560.32 per TON · qty 500.0 · bid tab
  • 2025-08-13 · ARDOT · 020628 · $110.69 per TON · qty 14.0 · bid tab
  • 2024-05-22 · ARDOT · 020784 · $500.00 per TON · qty 200.0 · bid tab
  • 2024-05-22 · ARDOT · 020784 · $100.00 per TON · qty 7.0 · bid tab
storm pipe 18-inchLF2$338.12$145.75 to $530.48
Bids
  • 2025-08-13 · ARDOT · 020628 · $530.48 per LF · qty 128.0 · bid tab
  • 2024-01-17 · ARDOT · C35009 · $145.75 per LF · qty 20.0 · bid tab
storm pipe 22-inchLF1$112.68$112.68 to $112.68
Bids
  • 2025-08-13 · ARDOT · 020628 · $112.68 per LF · qty 11490.0 · bid tab
storm pipe 24-inchLF2$168.11$135.00 to $201.22
Bids
  • 2026-05-20 · ARDOT · 020802 · $135.00 per LF · qty 122.0 · bid tab
  • 2025-08-13 · ARDOT · 020628 · $201.22 per LF · qty 30.0 · bid tab
storm pipe 29-inchLF1$149.51$149.51 to $149.51
Bids
  • 2025-08-13 · ARDOT · 020628 · $149.51 per LF · qty 1696.0 · bid tab
storm pipe 36-inchLF2$314.14$245.00 to $383.29
Bids
  • 2026-05-20 · ARDOT · 020802 · $245.00 per LF · qty 72.0 · bid tab
  • 2025-08-13 · ARDOT · 020628 · $383.29 per LF · qty 88.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.