Site-work prices, Independence County, AR

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON17$120.00$120.00 to $370.29
Bids
  • 2026-05-20 · ARDOT · SA3280 · $120.00 per TON · qty 259.0 · bid tab
  • 2026-04-08 · ARDOT · A50046 · $120.00 per TON · qty 128.0 · bid tab
  • 2026-04-08 · ARDOT · A50046 · $120.00 per TON · qty 48.0 · bid tab
  • 2026-04-08 · ARDOT · A50046 · $120.00 per TON · qty 283.0 · bid tab
  • 2026-04-08 · ARDOT · A50046 · $120.00 per TON · qty 419.0 · bid tab
  • 2026-01-21 · ARDOT · C32011 · $120.00 per TON · qty 99.0 · bid tab
  • 2025-05-21 · ARDOT · C32005 · $370.29 per TON · qty 2.0 · bid tab
  • 2025-05-21 · ARDOT · C32005 · $120.00 per TON · qty 108.0 · bid tab
  • 2025-05-21 · ARDOT · C32005 · $120.00 per TON · qty 162.0 · bid tab
  • 2025-05-21 · ARDOT · C32005 · $120.00 per TON · qty 91.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed)
concrete pavementSQYD1$108.00$108.00 to $108.00
Bids
  • 2025-05-21 · ARDOT · C32005 · $108.00 per SQYD · qty 668.0 · bid tab
curb gutterLF2$29.30$23.60 to $35.00
Bids
  • 2025-05-21 · ARDOT · C32005 · $23.60 per LF · qty 3122.0 · bid tab
  • 2025-05-21 · ARDOT · C32005 · $35.00 per LF · qty 280.0 · bid tab
excavation embankmentCUYD3$51.73$42.33 to $339.77
Bids
  • 2025-05-21 · ARDOT · C32005 · $42.33 per CUYD · qty 4365.0 · bid tab
  • 2025-05-21 · ARDOT · C32005 · $51.73 per CUYD · qty 3423.0 · bid tab
  • 2025-02-26 · ARDOT · A50038 · $339.77 per CUYD · qty 12.0 · bid tab
flexible baseTON5$29.94$23.19 to $103.95
Bids
  • 2026-05-20 · ARDOT · SA3280 · $28.50 per TON · qty 464.0 · bid tab
  • 2026-04-08 · ARDOT · A50046 · $23.19 per TON · qty 2794.0 · bid tab
  • 2025-05-21 · ARDOT · C32005 · $65.87 per TON · qty 1004.0 · bid tab
  • 2025-05-21 · ARDOT · C32005 · $103.95 per TON · qty 2579.0 · bid tab
  • 2025-02-26 · ARDOT · A50038 · $29.94 per TON · qty 3549.0 · bid tab
inlet headwallEACH1$900.00$900.00 to $900.00
Bids
  • 2025-05-21 · ARDOT · C32005 · $900.00 per EACH · qty 18.0 · bid tab
lime cement stabilizationTON2$8.75$5.00 to $12.50
Bids
  • 2026-04-08 · ARDOT · A50046 · $5.00 per TON · qty 1.0 · bid tab
  • 2025-02-26 · ARDOT · A50038 · $12.50 per TON · qty 2.0 · bid tab
storm pipe 18-inchLF1$229.57$229.57 to $229.57
Bids
  • 2025-05-21 · ARDOT · C32005 · $229.57 per LF · qty 844.0 · bid tab
storm pipe 22-inchLF1$304.58$304.58 to $304.58
Bids
  • 2025-05-21 · ARDOT · C32005 · $304.58 per LF · qty 144.0 · bid tab
storm pipe 24-inchLF2$167.55$161.78 to $173.31
Bids
  • 2025-05-21 · ARDOT · C32005 · $161.78 per LF · qty 142.0 · bid tab
  • 2025-05-21 · ARDOT · C32005 · $173.31 per LF · qty 91.0 · bid tab
storm pipe 29-inchLF1$321.53$321.53 to $321.53
Bids
  • 2025-05-21 · ARDOT · C32005 · $321.53 per LF · qty 109.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.