| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 17 | $120.00 | $120.00 to $370.29 | Bids- 2026-05-20 · ARDOT · SA3280 · $120.00 per TON · qty 259.0 · bid tab
- 2026-04-08 · ARDOT · A50046 · $120.00 per TON · qty 128.0 · bid tab
- 2026-04-08 · ARDOT · A50046 · $120.00 per TON · qty 48.0 · bid tab
- 2026-04-08 · ARDOT · A50046 · $120.00 per TON · qty 283.0 · bid tab
- 2026-04-08 · ARDOT · A50046 · $120.00 per TON · qty 419.0 · bid tab
- 2026-01-21 · ARDOT · C32011 · $120.00 per TON · qty 99.0 · bid tab
- 2025-05-21 · ARDOT · C32005 · $370.29 per TON · qty 2.0 · bid tab
- 2025-05-21 · ARDOT · C32005 · $120.00 per TON · qty 108.0 · bid tab
- 2025-05-21 · ARDOT · C32005 · $120.00 per TON · qty 162.0 · bid tab
- 2025-05-21 · ARDOT · C32005 · $120.00 per TON · qty 91.0 · bid tab
(10 most recent of 17 shown; all in the Hubstake feed) |
| concrete pavement | SQYD | 1 | $108.00 | $108.00 to $108.00 | Bids- 2025-05-21 · ARDOT · C32005 · $108.00 per SQYD · qty 668.0 · bid tab
|
| curb gutter | LF | 2 | $29.30 | $23.60 to $35.00 | Bids- 2025-05-21 · ARDOT · C32005 · $23.60 per LF · qty 3122.0 · bid tab
- 2025-05-21 · ARDOT · C32005 · $35.00 per LF · qty 280.0 · bid tab
|
| excavation embankment | CUYD | 3 | $51.73 | $42.33 to $339.77 | Bids- 2025-05-21 · ARDOT · C32005 · $42.33 per CUYD · qty 4365.0 · bid tab
- 2025-05-21 · ARDOT · C32005 · $51.73 per CUYD · qty 3423.0 · bid tab
- 2025-02-26 · ARDOT · A50038 · $339.77 per CUYD · qty 12.0 · bid tab
|
| flexible base | TON | 5 | $29.94 | $23.19 to $103.95 | Bids- 2026-05-20 · ARDOT · SA3280 · $28.50 per TON · qty 464.0 · bid tab
- 2026-04-08 · ARDOT · A50046 · $23.19 per TON · qty 2794.0 · bid tab
- 2025-05-21 · ARDOT · C32005 · $65.87 per TON · qty 1004.0 · bid tab
- 2025-05-21 · ARDOT · C32005 · $103.95 per TON · qty 2579.0 · bid tab
- 2025-02-26 · ARDOT · A50038 · $29.94 per TON · qty 3549.0 · bid tab
|
| inlet headwall | EACH | 1 | $900.00 | $900.00 to $900.00 | Bids- 2025-05-21 · ARDOT · C32005 · $900.00 per EACH · qty 18.0 · bid tab
|
| lime cement stabilization | TON | 2 | $8.75 | $5.00 to $12.50 | Bids- 2026-04-08 · ARDOT · A50046 · $5.00 per TON · qty 1.0 · bid tab
- 2025-02-26 · ARDOT · A50038 · $12.50 per TON · qty 2.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $229.57 | $229.57 to $229.57 | Bids- 2025-05-21 · ARDOT · C32005 · $229.57 per LF · qty 844.0 · bid tab
|
| storm pipe 22-inch | LF | 1 | $304.58 | $304.58 to $304.58 | Bids- 2025-05-21 · ARDOT · C32005 · $304.58 per LF · qty 144.0 · bid tab
|
| storm pipe 24-inch | LF | 2 | $167.55 | $161.78 to $173.31 | Bids- 2025-05-21 · ARDOT · C32005 · $161.78 per LF · qty 142.0 · bid tab
- 2025-05-21 · ARDOT · C32005 · $173.31 per LF · qty 91.0 · bid tab
|
| storm pipe 29-inch | LF | 1 | $321.53 | $321.53 to $321.53 | Bids- 2025-05-21 · ARDOT · C32005 · $321.53 per LF · qty 109.0 · bid tab
|