Site-work prices, Fulton County, AR
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 9 | $120.00 | $22.50 to $800.00 | Bids- 2026-03-04 · ARDOT · SA2550 · $120.00 per TON · qty 7.0 · bid tab
- 2026-03-04 · ARDOT · SA2550 · $22.50 per TON · qty 606.0 · bid tab
- 2026-01-21 · ARDOT · C25005 · $120.00 per TON · qty 3.0 · bid tab
- 2026-01-21 · ARDOT · C25005 · $120.00 per TON · qty 209.0 · bid tab
- 2025-02-26 · ARDOT · SA2549 · $62.01 per TON · qty 1070.0 · bid tab
- 2025-02-26 · ARDOT · SA2549 · $120.00 per TON · qty 66.0 · bid tab
- 2024-05-22 · ARDOT · 050422 · $800.00 per TON · qty 144.0 · bid tab
- 2024-05-22 · ARDOT · 050422 · $120.00 per TON · qty 86.0 · bid tab
- 2024-02-28 · ARDOT · A50026 · $120.00 per TON · qty 2018.0 · bid tab
|
| excavation embankment | CUYD | 2 | $18.75 | $17.00 to $20.50 | Bids- 2024-05-22 · ARDOT · 050422 · $20.50 per CUYD · qty 42059.0 · bid tab
- 2024-05-22 · ARDOT · 050422 · $17.00 per CUYD · qty 14588.0 · bid tab
|
| flexible base | CUYD | 1 | $72.94 | $72.94 to $72.94 | Bids- 2026-01-21 · ARDOT · C25005 · $72.94 per CUYD · qty 316.0 · bid tab
|
| flexible base | TON | 3 | $36.00 | $27.53 to $44.22 | Bids- 2025-02-26 · ARDOT · SA2549 · $44.22 per TON · qty 71.0 · bid tab
- 2024-05-22 · ARDOT · 050422 · $36.00 per TON · qty 7424.0 · bid tab
- 2024-02-28 · ARDOT · A50026 · $27.53 per TON · qty 7829.0 · bid tab
|
| lime cement stabilization | TON | 1 | $100.00 | $100.00 to $100.00 | Bids- 2024-05-22 · ARDOT · 050422 · $100.00 per TON · qty 19.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.