Site-work prices, Dallas County, AR
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 10 | $120.00 | $120.00 to $1,200.00 | Bids- 2026-09-23 · ARDOT · SA2046 · $120.00 per TON · qty 112.0 · bid tab
- 2026-04-08 · ARDOT · C20006 · $120.00 per TON · qty 95.0 · bid tab
- 2026-01-21 · ARDOT · A70035 · $170.00 per TON · qty 2532.0 · bid tab
- 2026-01-21 · ARDOT · A70035 · $120.00 per TON · qty 21.0 · bid tab
- 2026-01-21 · ARDOT · A70035 · $120.00 per TON · qty 3.0 · bid tab
- 2026-01-21 · ARDOT · SA2045 · $120.00 per TON · qty 85.0 · bid tab
- 2025-04-09 · ARDOT · SA2044 · $120.00 per TON · qty 105.0 · bid tab
- 2024-02-28 · ARDOT · A70027 · $920.00 per TON · qty 31.0 · bid tab
- 2024-02-28 · ARDOT · A70027 · $120.00 per TON · qty 2565.0 · bid tab
- 2024-02-28 · ARDOT · C20005 · $1,200.00 per TON · qty 86.0 · bid tab
|
| flexible base | TON | 4 | $57.70 | $52.00 to $80.00 | Bids- 2026-04-08 · ARDOT · C20006 · $55.40 per TON · qty 1800.0 · bid tab
- 2026-01-21 · ARDOT · A70035 · $52.00 per TON · qty 3867.0 · bid tab
- 2024-02-28 · ARDOT · A70027 · $60.00 per TON · qty 1809.0 · bid tab
- 2024-02-28 · ARDOT · C20005 · $80.00 per TON · qty 162.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $150.00 | $150.00 to $150.00 | Bids- 2026-04-08 · ARDOT · C20006 · $150.00 per LF · qty 24.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $800.00 | $800.00 to $800.00 | Bids- 2026-04-08 · ARDOT · C20006 · $800.00 per LF · qty 4.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.