Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON2$120.00$120.00 to $120.00
Bids
  • 2026-03-04 · ARDOT · A00096 · $120.00 per TON · qty 230.0 · bid tab
  • 2026-03-04 · ARDOT · A00096 · $120.00 per TON · qty 1891.0 · bid tab
flexible baseTON1$37.62$37.62 to $37.62
Bids
  • 2026-03-04 · ARDOT · A00096 · $37.62 per TON · qty 3155.0 · bid tab
lime cement stabilizationTON1$10.00$10.00 to $10.00
Bids
  • 2026-03-04 · ARDOT · A00096 · $10.00 per TON · qty 11.0 · bid tab
storm pipe 18-inchLF2$472.27$366.91 to $577.63
Bids
  • 2026-03-04 · ARDOT · A00096 · $366.91 per LF · qty 20.0 · bid tab
  • 2026-03-04 · ARDOT · A00096 · $577.63 per LF · qty 10.0 · bid tab
storm pipe 24-inchLF3$274.22$195.81 to $794.42
Bids
  • 2026-03-04 · ARDOT · A00096 · $274.22 per LF · qty 111.0 · bid tab
  • 2026-03-04 · ARDOT · A00096 · $794.42 per LF · qty 4.0 · bid tab
  • 2026-03-04 · ARDOT · A00096 · $195.81 per LF · qty 34.0 · bid tab
storm pipe 30-inchLF1$981.89$981.89 to $981.89
Bids
  • 2026-03-04 · ARDOT · A00096 · $981.89 per LF · qty 12.0 · bid tab
storm pipe 36-inchLF2$959.48$919.10 to $999.85
Bids
  • 2026-03-04 · ARDOT · A00096 · $999.85 per LF · qty 12.0 · bid tab
  • 2026-03-04 · ARDOT · A00096 · $919.10 per LF · qty 6.0 · bid tab
storm pipe 72-inchLF1$961.09$961.09 to $961.09
Bids
  • 2026-03-04 · ARDOT · A00096 · $961.09 per LF · qty 34.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.