Site-work prices, Columbia, Union County, AR
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|---|---|---|---|---|
| asphalt pavement | TON | 3 | $120.00 | $120.00 to $120.00 | |
| excavation embankment | CUYD | 2 | $22.25 | $17.50 to $27.00 | |
| flexible base | TON | 2 | $108.63 | $57.00 to $160.26 | |
| lime cement stabilization | TON | 2 | $232.50 | $75.00 to $390.00 |
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.