| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 12 | $120.20 | $96.80 to $202.00 | Bids- 2026-04-08 · ARDOT · SA1068 · $184.00 per TON · qty 33.0 · bid tab
- 2026-04-08 · ARDOT · SA1068 · $96.80 per TON · qty 595.0 · bid tab
- 2026-01-21 · ARDOT · C10008 · $160.50 per TON · qty 196.0 · bid tab
- 2026-01-21 · ARDOT · C10008 · $153.00 per TON · qty 5.0 · bid tab
- 2025-09-17 · ARDOT · 070509 · $120.00 per TON · qty 89.0 · bid tab
- 2025-09-17 · ARDOT · 070509 · $120.00 per TON · qty 118.0 · bid tab
- 2025-09-17 · ARDOT · 070509 · $120.00 per TON · qty 14.0 · bid tab
- 2025-09-17 · ARDOT · 070509 · $120.00 per TON · qty 37.0 · bid tab
- 2025-05-21 · ARDOT · SA1067 · $120.40 per TON · qty 138.0 · bid tab
- 2024-05-22 · ARDOT · SA1066 · $120.00 per TON · qty 150.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed) |
| curb gutter | LF | 2 | $71.00 | $42.00 to $100.00 | Bids- 2026-01-21 · ARDOT · C10008 · $100.00 per LF · qty 80.0 · bid tab
- 2025-09-17 · ARDOT · 070509 · $42.00 per LF · qty 3652.0 · bid tab
|
| excavation embankment | CUYD | 2 | $17.52 | $16.13 to $18.91 | Bids- 2025-09-17 · ARDOT · 070509 · $16.13 per CUYD · qty 2533.0 · bid tab
- 2025-09-17 · ARDOT · 070509 · $18.91 per CUYD · qty 32661.0 · bid tab
|
| flexible base | TON | 6 | $61.64 | $43.10 to $175.35 | Bids- 2026-01-21 · ARDOT · C10008 · $56.43 per TON · qty 2847.0 · bid tab
- 2025-09-17 · ARDOT · 070509 · $175.35 per TON · qty 2142.0 · bid tab
- 2025-09-17 · ARDOT · 070509 · $43.10 per TON · qty 1797.0 · bid tab
- 2025-05-21 · ARDOT · SA1067 · $58.28 per TON · qty 253.0 · bid tab
- 2024-05-22 · ARDOT · SA1066 · $95.00 per TON · qty 312.0 · bid tab
- 2024-01-17 · ARDOT · C10007 · $65.00 per TON · qty 387.0 · bid tab
|
| inlet headwall | EACH | 1 | $2,850.00 | $2,850.00 to $2,850.00 | Bids- 2025-09-17 · ARDOT · 070509 · $2,850.00 per EACH · qty 5.0 · bid tab
|
| lime cement stabilization | TON | 2 | $122.50 | $45.00 to $200.00 | Bids- 2025-09-17 · ARDOT · 070509 · $45.00 per TON · qty 17.0 · bid tab
- 2025-09-17 · ARDOT · 070509 · $200.00 per TON · qty 400.0 · bid tab
|
| manhole | EACH | 1 | $7,800.00 | $7,800.00 to $7,800.00 | Bids- 2025-09-17 · ARDOT · 070509 · $7,800.00 per EACH · qty 8.0 · bid tab
|
| storm pipe 18-inch | LF | 3 | $83.14 | $80.00 to $86.18 | Bids- 2026-01-21 · ARDOT · C10008 · $80.00 per LF · qty 24.0 · bid tab
- 2025-09-17 · ARDOT · 070509 · $83.14 per LF · qty 947.0 · bid tab
- 2025-09-17 · ARDOT · 070509 · $86.18 per LF · qty 418.0 · bid tab
|
| storm pipe 24-inch | LF | 2 | $629.00 | $107.45 to $1,150.55 | Bids- 2025-09-17 · ARDOT · 070509 · $1,150.55 per LF · qty 56.0 · bid tab
- 2025-09-17 · ARDOT · 070509 · $107.45 per LF · qty 308.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $173.39 | $173.39 to $173.39 | Bids- 2025-09-17 · ARDOT · 070509 · $173.39 per LF · qty 470.0 · bid tab
|
| storm pipe 42-inch | LF | 2 | $229.88 | $222.82 to $236.95 | Bids- 2025-09-17 · ARDOT · 070509 · $236.95 per LF · qty 247.0 · bid tab
- 2025-09-17 · ARDOT · 070509 · $222.82 per LF · qty 22.0 · bid tab
|