Site-work prices, Boone County, AR

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON14$120.00$120.00 to $250.00
Bids
  • 2026-03-04 · ARDOT · C05011 · $120.00 per TON · qty 125.0 · bid tab
  • 2026-01-21 · ARDOT · C05010 · $120.00 per TON · qty 145.0 · bid tab
  • 2025-08-13 · ARDOT · SA0563 · $120.00 per TON · qty 297.0 · bid tab
  • 2025-05-21 · ARDOT · 090581 · $120.00 per TON · qty 639.0 · bid tab
  • 2025-05-21 · ARDOT · 090581 · $120.00 per TON · qty 184.0 · bid tab
  • 2025-05-21 · ARDOT · 090581 · $120.00 per TON · qty 992.0 · bid tab
  • 2025-04-09 · ARDOT · A90035 · $120.00 per TON · qty 1002.0 · bid tab
  • 2024-11-06 · ARDOT · 090490 · $200.00 per TON · qty 16.0 · bid tab
  • 2024-11-06 · ARDOT · 090490 · $200.00 per TON · qty 9.0 · bid tab
  • 2024-11-06 · ARDOT · 090490 · $200.00 per TON · qty 17.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed)
curb gutterLF2$75.65$40.00 to $111.29
Bids
  • 2025-05-21 · ARDOT · 090581 · $111.29 per LF · qty 400.0 · bid tab
  • 2024-11-06 · ARDOT · 090490 · $40.00 per LF · qty 1778.0 · bid tab
excavation embankmentCUYD4$22.98$8.95 to $40.00
Bids
  • 2025-05-21 · ARDOT · 090581 · $10.95 per CUYD · qty 195624.0 · bid tab
  • 2025-05-21 · ARDOT · 090581 · $8.95 per CUYD · qty 125501.0 · bid tab
  • 2024-11-06 · ARDOT · 090490 · $35.00 per CUYD · qty 423.0 · bid tab
  • 2024-11-06 · ARDOT · 090490 · $40.00 per CUYD · qty 2420.0 · bid tab
flexible baseTON9$28.00$18.00 to $250.00
Bids
  • 2026-03-04 · ARDOT · C05011 · $18.00 per TON · qty 295.0 · bid tab
  • 2026-01-21 · ARDOT · C05010 · $27.25 per TON · qty 1811.0 · bid tab
  • 2025-08-13 · ARDOT · SA0563 · $40.00 per TON · qty 516.0 · bid tab
  • 2025-05-21 · ARDOT · 090581 · $80.04 per TON · qty 4092.0 · bid tab
  • 2025-05-21 · ARDOT · 090581 · $24.41 per TON · qty 40888.0 · bid tab
  • 2025-04-09 · ARDOT · A90035 · $23.07 per TON · qty 1785.0 · bid tab
  • 2024-11-06 · ARDOT · 090490 · $60.00 per TON · qty 63.0 · bid tab
  • 2024-11-06 · ARDOT · 090490 · $250.00 per TON · qty 368.0 · bid tab
  • 2024-04-10 · ARDOT · 090602 · $28.00 per TON · qty 3239.0 · bid tab
lime cement stabilizationTON3$80.00$1.48 to $125.00
Bids
  • 2025-05-21 · ARDOT · 090581 · $80.00 per TON · qty 81.0 · bid tab
  • 2025-05-21 · ARDOT · 090581 · $1.48 per TON · qty 750.0 · bid tab
  • 2024-04-10 · ARDOT · 090602 · $125.00 per TON · qty 9.0 · bid tab
manholeEACH1$7,544.74$7,544.74 to $7,544.74
Bids
  • 2025-05-21 · ARDOT · 090581 · $7,544.74 per EACH · qty 2.0 · bid tab
storm pipe 24-inchLF2$120.36$110.00 to $130.73
Bids
  • 2025-05-21 · ARDOT · 090581 · $130.73 per LF · qty 1143.0 · bid tab
  • 2024-11-06 · ARDOT · 090490 · $110.00 per LF · qty 102.0 · bid tab
storm pipe 29-inchLF1$200.00$200.00 to $200.00
Bids
  • 2024-11-06 · ARDOT · 090490 · $200.00 per LF · qty 46.0 · bid tab
storm pipe 36-inchLF1$176.33$176.33 to $176.33
Bids
  • 2025-05-21 · ARDOT · 090581 · $176.33 per LF · qty 98.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.