Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON11$120.00$107.42 to $120.00
Bids
  • 2026-05-20 · ARDOT · SA0367 · $120.00 per TON · qty 299.0 · bid tab
  • 2026-03-04 · ARDOT · A90039 · $120.00 per TON · qty 230.0 · bid tab
  • 2026-03-04 · ARDOT · A90039 · $120.00 per TON · qty 1077.0 · bid tab
  • 2026-03-04 · ARDOT · A90039 · $107.42 per TON · qty 61.0 · bid tab
  • 2025-11-05 · ARDOT · A90042 · $120.00 per TON · qty 37.0 · bid tab
  • 2025-11-05 · ARDOT · A90042 · $120.00 per TON · qty 552.0 · bid tab
  • 2025-09-17 · ARDOT · 090647 · $120.00 per TON · qty 20.0 · bid tab
  • 2025-09-17 · ARDOT · 090647 · $120.00 per TON · qty 60.0 · bid tab
  • 2025-09-17 · ARDOT · 090647 · $120.00 per TON · qty 4.0 · bid tab
  • 2025-09-17 · ARDOT · 090647 · $120.00 per TON · qty 23.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
curb gutterLF1$30.00$30.00 to $30.00
Bids
  • 2025-09-17 · ARDOT · 090647 · $30.00 per LF · qty 1382.0 · bid tab
excavation embankmentCUYD4$25.19$15.00 to $60.00
Bids
  • 2026-03-04 · ARDOT · A90039 · $30.38 per CUYD · qty 50.0 · bid tab
  • 2026-03-04 · ARDOT · A90039 · $60.00 per CUYD · qty 50.0 · bid tab
  • 2025-09-17 · ARDOT · 090647 · $15.00 per CUYD · qty 4700.0 · bid tab
  • 2025-09-17 · ARDOT · 090647 · $20.00 per CUYD · qty 4328.0 · bid tab
flexible baseTON4$36.56$21.78 to $130.00
Bids
  • 2026-03-04 · ARDOT · A90039 · $48.13 per TON · qty 46.0 · bid tab
  • 2025-11-05 · ARDOT · A90042 · $21.78 per TON · qty 1542.0 · bid tab
  • 2025-09-17 · ARDOT · 090647 · $130.00 per TON · qty 419.0 · bid tab
  • 2025-09-17 · ARDOT · 090647 · $25.00 per TON · qty 784.0 · bid tab
inlet headwallEACH1$1,500.00$1,500.00 to $1,500.00
Bids
  • 2025-09-17 · ARDOT · 090647 · $1,500.00 per EACH · qty 4.0 · bid tab
lime cement stabilizationTON3$65.00$10.00 to $125.00
Bids
  • 2026-03-04 · ARDOT · A90039 · $125.00 per TON · qty 10.0 · bid tab
  • 2025-09-17 · ARDOT · 090647 · $65.00 per TON · qty 3.0 · bid tab
  • 2025-09-17 · ARDOT · 090647 · $10.00 per TON · qty 25.0 · bid tab
storm pipe 18-inchLF1$90.00$90.00 to $90.00
Bids
  • 2025-09-17 · ARDOT · 090647 · $90.00 per LF · qty 82.0 · bid tab
storm pipe 24-inchLF2$150.38$147.82 to $152.94
Bids
  • 2026-03-04 · ARDOT · A90039 · $152.94 per LF · qty 28.0 · bid tab
  • 2026-03-04 · ARDOT · A90039 · $147.82 per LF · qty 125.0 · bid tab
storm pipe 30-inchLF1$173.52$173.52 to $173.52
Bids
  • 2026-03-04 · ARDOT · A90039 · $173.52 per LF · qty 32.0 · bid tab