Site-work prices, Ashley County, AR
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|---|---|---|---|---|
| asphalt pavement | TON | 7 | $400.00 | $95.00 to $1,200.00 | Bids
|
| flexible base | STA | 1 | $300.00 | $300.00 to $300.00 | Bids
|
| flexible base | TON | 2 | $84.00 | $73.00 to $95.00 | |
| storm pipe 24-inch | LF | 1 | $300.00 | $300.00 to $300.00 | Bids
|
| storm pipe 30-inch | LF | 1 | $350.00 | $350.00 to $350.00 | Bids
|
| storm pipe 36-inch | LF | 1 | $400.00 | $400.00 to $400.00 | Bids
|
| storm pipe 42-inch | LF | 1 | $500.00 | $500.00 to $500.00 | Bids
|
| storm pipe 44-inch | LF | 1 | $500.00 | $500.00 to $500.00 | Bids
|
| storm pipe 48-inch | LF | 1 | $550.00 | $550.00 to $550.00 | Bids
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.