| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | Ton | 25 | $130.00 | $98.89 to $702.00 | Bids- 2026-04-24 · ALDOT · 20260424023 · $230.82 per Ton · qty 365.0 · bid tab
- 2026-04-24 · ALDOT · 20260424023 · $101.51 per Ton · qty 14035.0 · bid tab
- 2026-04-24 · ALDOT · 20260424023 · $208.23 per Ton · qty 250.0 · bid tab
- 2026-04-24 · ALDOT · 20260424027 · $102.13 per Ton · qty 8195.0 · bid tab
- 2026-04-24 · ALDOT · 20260424027 · $112.21 per Ton · qty 425.0 · bid tab
- 2026-04-24 · ALDOT · 20260424027 · $201.52 per Ton · qty 250.0 · bid tab
- 2026-04-24 · ALDOT · 20260424027 · $206.68 per Ton · qty 375.0 · bid tab
- 2025-12-05 · ALDOT · 20251205059 · $702.00 per Ton · qty 25.0 · bid tab
- 2025-12-05 · ALDOT · 20251205059 · $363.00 per Ton · qty 116.0 · bid tab
- 2025-12-05 · ALDOT · 20251205059 · $163.00 per Ton · qty 575.0 · bid tab
(10 most recent of 25 shown; all in the Hubstake feed) |
| curb gutter | LF | 3 | $70.00 | $70.00 to $75.00 | Bids- 2025-12-05 · ALDOT · 20251205059 · $70.00 per LF · qty 381.0 · bid tab
- 2025-12-05 · ALDOT · 20251205059 · $70.00 per LF · qty 478.0 · bid tab
- 2025-12-05 · ALDOT · 20251205059 · $75.00 per LF · qty 98.0 · bid tab
|
| excavation embankment | CUYD | 7 | $41.00 | $11.00 to $80.00 | Bids- 2025-12-05 · ALDOT · 20251205059 · $75.00 per CUYD · qty 584.0 · bid tab
- 2025-12-05 · ALDOT · 20251205059 · $75.00 per CUYD · qty 119.0 · bid tab
- 2024-12-06 · ALDOT · 20241206007 · $11.00 per CUYD · qty 33027.0 · bid tab
- 2024-12-06 · ALDOT · 20241206007 · $41.00 per CUYD · qty 2060.0 · bid tab
- 2024-12-06 · ALDOT · 20241206007 · $16.00 per CUYD · qty 1245.0 · bid tab
- 2024-11-08 · ALDOT · 20241108062 · $80.00 per CUYD · qty 2498.0 · bid tab
- 2024-11-08 · ALDOT · 20241108062 · $40.00 per CUYD · qty 2017.0 · bid tab
|
| flexible base | SQYD | 2 | $16.80 | $16.45 to $17.14 | Bids- 2024-12-06 · ALDOT · 20241206007 · $16.45 per SQYD · qty 8247.0 · bid tab
- 2024-11-08 · ALDOT · 20241108062 · $17.14 per SQYD · qty 2587.0 · bid tab
|
| inlet headwall | Each | 2 | $1,500.00 | $1,500.00 to $1,500.00 | Bids- 2025-12-05 · ALDOT · 20251205059 · $1,500.00 per Each · qty 1.0 · bid tab
- 2025-12-05 · ALDOT · 20251205059 · $1,500.00 per Each · qty 1.0 · bid tab
|
| manhole | Each | 2 | $6,000.00 | $2,000.00 to $10,000.00 | Bids- 2025-12-05 · ALDOT · 20251205059 · $2,000.00 per Each · qty 1.0 · bid tab
- 2025-12-05 · ALDOT · 20251205059 · $10,000.00 per Each · qty 1.0 · bid tab
|
| storm pipe 15-inch | LF | 1 | $81.00 | $81.00 to $81.00 | Bids- 2024-11-08 · ALDOT · 20241108062 · $81.00 per LF · qty 38.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $88.00 | $88.00 to $88.00 | Bids- 2024-11-08 · ALDOT · 20241108062 · $88.00 per LF · qty 48.0 · bid tab
|
| storm pipe 22-inch | LF | 2 | $158.50 | $150.00 to $167.00 | Bids- 2025-12-05 · ALDOT · 20251205059 · $150.00 per LF · qty 130.0 · bid tab
- 2024-11-08 · ALDOT · 20241108062 · $167.00 per LF · qty 89.0 · bid tab
|
| storm pipe 42-inch | LF | 1 | $295.00 | $295.00 to $295.00 | Bids- 2024-11-08 · ALDOT · 20241108062 · $295.00 per LF · qty 90.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $40.00 | $40.00 to $40.00 | Bids- 2025-12-05 · ALDOT · 20251205059 · $40.00 per LF · qty 172.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 2 | $129.47 | $44.50 to $214.44 | Bids- 2026-04-24 · ALDOT · 20260424023 · $214.44 per LF · qty 330.0 · bid tab
- 2024-12-06 · ALDOT · 20241206007 · $44.50 per LF · qty 100.0 · bid tab
|