Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon16$161.90$34.16 to $325.00
Bids
  • 2026-06-26 · ALDOT · 20260626032 · $152.60 per Ton · qty 250.0 · bid tab
  • 2026-06-26 · ALDOT · 20260626032 · $145.44 per Ton · qty 6041.0 · bid tab
  • 2026-02-27 · ALDOT · 20260227022 · $34.16 per Ton · qty 1000.0 · bid tab
  • 2026-02-27 · ALDOT · 20260227022 · $139.84 per Ton · qty 7355.0 · bid tab
  • 2026-02-27 · ALDOT · 20260227022 · $132.96 per Ton · qty 12390.0 · bid tab
  • 2025-11-07 · ALDOT · 20251107036 · $162.75 per Ton · qty 500.0 · bid tab
  • 2025-05-30 · ALDOT · 20250530007 · $161.05 per Ton · qty 584.0 · bid tab
  • 2025-05-30 · ALDOT · 20250530007 · $140.29 per Ton · qty 2577.0 · bid tab
  • 2025-05-30 · ALDOT · 20250530007 · $165.00 per Ton · qty 100.0 · bid tab
  • 2025-05-30 · ALDOT · 20250530007 · $151.13 per Ton · qty 893.0 · bid tab
(10 most recent of 16 shown; all in the Hubstake feed)
curb gutterLF3$99.71$65.00 to $103.91
Bids
  • 2026-06-26 · ALDOT · 20260626032 · $65.00 per LF · qty 470.0 · bid tab
  • 2025-01-31 · ALDOT · 20250131015 · $103.91 per LF · qty 43.0 · bid tab
  • 2025-01-31 · ALDOT · 20250131015 · $99.71 per LF · qty 24.0 · bid tab
excavation embankmentCUYD6$56.50$36.47 to $75.00
Bids
  • 2026-06-26 · ALDOT · 20260626032 · $60.00 per CUYD · qty 50.0 · bid tab
  • 2026-06-26 · ALDOT · 20260626032 · $75.00 per CUYD · qty 50.0 · bid tab
  • 2025-05-30 · ALDOT · 20250530007 · $36.50 per CUYD · qty 1784.0 · bid tab
  • 2025-05-30 · ALDOT · 20250530007 · $53.00 per CUYD · qty 306.0 · bid tab
  • 2025-01-31 · ALDOT · 20250131015 · $36.47 per CUYD · qty 3230.0 · bid tab
  • 2025-01-31 · ALDOT · 20250131015 · $64.02 per CUYD · qty 335.0 · bid tab
inlet headwallEach2$978.48$850.00 to $1,106.95
Bids
  • 2025-05-30 · ALDOT · 20250530007 · $850.00 per Each · qty 1.0 · bid tab
  • 2025-01-31 · ALDOT · 20250131015 · $1,106.95 per Each · qty 2.0 · bid tab
manholeEach1$350.00$350.00 to $350.00
Bids
  • 2026-06-26 · ALDOT · 20260626032 · $350.00 per Each · qty 22.0 · bid tab
storm pipe 15-inchLF1$151.64$151.64 to $151.64
Bids
  • 2025-01-31 · ALDOT · 20250131015 · $151.64 per LF · qty 52.0 · bid tab
storm pipe 18-inchLF1$233.50$233.50 to $233.50
Bids
  • 2025-01-31 · ALDOT · 20250131015 · $233.50 per LF · qty 24.0 · bid tab
storm pipe 22-inchLF2$184.00$131.00 to $236.99
Bids
  • 2025-05-30 · ALDOT · 20250530007 · $131.00 per LF · qty 85.0 · bid tab
  • 2025-01-31 · ALDOT · 20250131015 · $236.99 per LF · qty 24.0 · bid tab
storm pipe 29-inchLF1$137.00$137.00 to $137.00
Bids
  • 2025-05-30 · ALDOT · 20250530007 · $137.00 per LF · qty 81.0 · bid tab
storm pipe (diameter not stated)LF2$69.69$42.00 to $97.38
Bids
  • 2025-11-07 · ALDOT · 20251107036 · $42.00 per LF · qty 525.0 · bid tab
  • 2024-12-06 · ALDOT · 20241206047 · $97.38 per LF · qty 38.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.