Site-work prices, Morgan, Limestone, Cullman County, AL

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon5$115.00$95.00 to $215.00
Bids
  • 2025-03-28 · ALDOT · 20250328005 · $95.00 per Ton · qty 19540.0 · bid tab
  • 2025-03-28 · ALDOT · 20250328005 · $215.00 per Ton · qty 389.0 · bid tab
  • 2025-03-28 · ALDOT · 20250328005 · $175.00 per Ton · qty 291.0 · bid tab
  • 2025-03-28 · ALDOT · 20250328005 · $110.00 per Ton · qty 57542.0 · bid tab
  • 2025-03-28 · ALDOT · 20250328005 · $115.00 per Ton · qty 976.0 · bid tab
concrete pavementLF2$6.00$5.50 to $6.50
Bids
  • 2025-03-28 · ALDOT · 20250328005 · $5.50 per LF · qty 2150.0 · bid tab
  • 2025-03-28 · ALDOT · 20250328005 · $6.50 per LF · qty 100.0 · bid tab
concrete pavementSQYD1$28.50$28.50 to $28.50
Bids
  • 2025-03-28 · ALDOT · 20250328005 · $28.50 per SQYD · qty 500.0 · bid tab
excavation embankmentCUYD1$58.00$58.00 to $58.00
Bids
  • 2025-03-28 · ALDOT · 20250328005 · $58.00 per CUYD · qty 281.0 · bid tab
flexible baseTon1$44.00$44.00 to $44.00
Bids
  • 2025-03-28 · ALDOT · 20250328005 · $44.00 per Ton · qty 6897.0 · bid tab
inlet headwallEach1$500.00$500.00 to $500.00
Bids
  • 2025-03-28 · ALDOT · 20250328005 · $500.00 per Each · qty 83.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.