Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon53$142.10$95.00 to $382.35
Bids
  • 2026-02-27 · ALDOT · 20260227024 · $204.64 per Ton · qty 112.0 · bid tab
  • 2026-02-27 · ALDOT · 20260227024 · $118.04 per Ton · qty 11305.0 · bid tab
  • 2026-02-27 · ALDOT · 20260227024 · $159.28 per Ton · qty 100.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130035 · $133.56 per Ton · qty 2819.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130035 · $232.28 per Ton · qty 50.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130035 · $311.60 per Ton · qty 52.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130035 · $174.35 per Ton · qty 707.0 · bid tab
  • 2025-12-05 · ALDOT · 20251205003 · $184.53 per Ton · qty 50.0 · bid tab
  • 2025-12-05 · ALDOT · 20251205003 · $120.41 per Ton · qty 2851.0 · bid tab
  • 2025-12-05 · ALDOT · 20251205003 · $233.80 per Ton · qty 166.0 · bid tab
(10 most recent of 53 shown; all in the Hubstake feed)
curb gutterLF8$35.67$26.25 to $106.64
Bids
  • 2025-12-05 · ALDOT · 20251205003 · $36.52 per LF · qty 121.0 · bid tab
  • 2025-12-05 · ALDOT · 20251205003 · $73.04 per LF · qty 147.0 · bid tab
  • 2025-11-07 · ALDOT · 20251107023 · $69.97 per LF · qty 100.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926027 · $30.45 per LF · qty 7112.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926027 · $26.25 per LF · qty 7397.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $34.81 per LF · qty 259.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $106.64 per LF · qty 60.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $29.05 per LF · qty 6011.0 · bid tab
excavation embankmentCUYD12$31.83$9.00 to $76.16
Bids
  • 2025-12-05 · ALDOT · 20251205003 · $31.26 per CUYD · qty 5651.0 · bid tab
  • 2025-12-05 · ALDOT · 20251205003 · $32.40 per CUYD · qty 9405.0 · bid tab
  • 2025-11-07 · ALDOT · 20251107023 · $69.72 per CUYD · qty 56.0 · bid tab
  • 2025-11-07 · ALDOT · 20251107023 · $76.16 per CUYD · qty 1840.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926027 · $44.30 per CUYD · qty 3750.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926027 · $37.80 per CUYD · qty 788.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926027 · $37.80 per CUYD · qty 1309.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $9.00 per CUYD · qty 22343.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $19.92 per CUYD · qty 12442.0 · bid tab
  • 2024-11-08 · ALDOT · 20241108061 · $16.65 per CUYD · qty 2570.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
fire hydrantEach2$7,859.25$6,426.00 to $9,292.50
Bids
  • 2025-09-26 · ALDOT · 20250926027 · $9,292.50 per Each · qty 7.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $6,426.00 per Each · qty 2.0 · bid tab
flexible baseSQYD5$36.68$26.84 to $53.43
Bids
  • 2025-12-05 · ALDOT · 20251205003 · $33.53 per SQYD · qty 11696.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926027 · $36.68 per SQYD · qty 8299.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425016 · $53.43 per SQYD · qty 20.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $26.84 per SQYD · qty 14758.0 · bid tab
  • 2024-11-08 · ALDOT · 20241108061 · $37.13 per SQYD · qty 6066.0 · bid tab
flexible baseTon4$62.61$37.13 to $80.00
Bids
  • 2026-01-30 · ALDOT · 20260130035 · $55.15 per Ton · qty 350.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425016 · $70.06 per Ton · qty 340.0 · bid tab
  • 2024-11-08 · ALDOT · 20241108061 · $37.13 per Ton · qty 127.0 · bid tab
  • 2023-12-08 · ALDOT · 20231208037 · $80.00 per Ton · qty 500.0 · bid tab
inlet headwallEach6$1,473.78$1,094.36 to $2,012.61
Bids
  • 2025-09-26 · ALDOT · 20250926027 · $1,094.36 per Each · qty 9.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926027 · $2,012.61 per Each · qty 2.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $1,109.85 per Each · qty 4.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $1,501.50 per Each · qty 1.0 · bid tab
  • 2024-11-08 · ALDOT · 20241108061 · $1,446.05 per Each · qty 1.0 · bid tab
  • 2024-11-08 · ALDOT · 20241108061 · $1,600.71 per Each · qty 2.0 · bid tab
lime cement stabilizationSQYD1$6.66$6.66 to $6.66
Bids
  • 2025-04-25 · ALDOT · 20250425035 · $6.66 per SQYD · qty 1000.0 · bid tab
manholeEach13$3,987.73$568.47 to $10,148.57
Bids
  • 2026-02-27 · ALDOT · 20260227024 · $4,336.17 per Each · qty 1.0 · bid tab
  • 2025-12-05 · ALDOT · 20251205003 · $3,486.01 per Each · qty 2.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926027 · $568.47 per Each · qty 62.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926027 · $3,987.73 per Each · qty 2.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926027 · $2,940.00 per Each · qty 2.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $10,148.57 per Each · qty 2.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $6,492.39 per Each · qty 4.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $1,375.92 per Each · qty 5.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $1,575.00 per Each · qty 1.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $4,599.75 per Each · qty 6.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
storm pipe 15-inchLF1$374.33$374.33 to $374.33
Bids
  • 2025-09-26 · ALDOT · 20250926027 · $374.33 per LF · qty 12.0 · bid tab
storm pipe 18-inchLF6$90.44$77.21 to $614.24
Bids
  • 2025-09-26 · ALDOT · 20250926027 · $577.31 per LF · qty 44.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926027 · $103.67 per LF · qty 379.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926027 · $614.24 per LF · qty 4.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $77.21 per LF · qty 2248.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $77.21 per LF · qty 48.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $77.21 per LF · qty 820.0 · bid tab
storm pipe 24-inchLF4$88.48$63.49 to $96.25
Bids
  • 2025-12-05 · ALDOT · 20251205003 · $96.25 per LF · qty 504.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $88.48 per LF · qty 65.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $88.48 per LF · qty 614.0 · bid tab
  • 2024-11-08 · ALDOT · 20241108061 · $63.49 per LF · qty 249.0 · bid tab
storm pipe 30-inchLF2$99.00$90.24 to $107.76
Bids
  • 2025-04-25 · ALDOT · 20250425035 · $107.76 per LF · qty 222.0 · bid tab
  • 2024-11-08 · ALDOT · 20241108061 · $90.24 per LF · qty 76.0 · bid tab
storm pipe 36-inchLF5$190.73$139.50 to $743.78
Bids
  • 2025-09-26 · ALDOT · 20250926027 · $743.78 per LF · qty 4.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $365.36 per LF · qty 25.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $139.50 per LF · qty 379.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $139.50 per LF · qty 70.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $190.73 per LF · qty 233.0 · bid tab
storm pipe 44-inchLF1$173.36$173.36 to $173.36
Bids
  • 2024-11-08 · ALDOT · 20241108061 · $173.36 per LF · qty 99.0 · bid tab
storm pipe 48-inchLF3$26.25$23.43 to $33.71
Bids
  • 2025-12-05 · ALDOT · 20251205003 · $33.71 per LF · qty 921.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926027 · $26.25 per LF · qty 636.0 · bid tab
  • 2024-11-08 · ALDOT · 20241108061 · $23.43 per LF · qty 137.0 · bid tab
storm pipe 51-inchLF1$330.70$330.70 to $330.70
Bids
  • 2025-04-25 · ALDOT · 20250425035 · $330.70 per LF · qty 127.0 · bid tab
storm pipe 54-inchLF2$314.71$243.17 to $386.26
Bids
  • 2025-04-25 · ALDOT · 20250425035 · $243.17 per LF · qty 186.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $386.26 per LF · qty 33.0 · bid tab
storm pipe 59-inchLF2$307.11$282.29 to $331.93
Bids
  • 2025-04-25 · ALDOT · 20250425035 · $282.29 per LF · qty 291.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $331.93 per LF · qty 62.0 · bid tab
storm pipe 65-inchLF1$320.01$320.01 to $320.01
Bids
  • 2025-04-25 · ALDOT · 20250425035 · $320.01 per LF · qty 174.0 · bid tab
water main 12-inchLF2$115.20$90.43 to $139.98
Bids
  • 2025-04-25 · ALDOT · 20250425035 · $90.43 per LF · qty 2205.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $139.98 per LF · qty 692.0 · bid tab
water main 6-inchLF3$107.10$105.00 to $210.00
Bids
  • 2025-09-26 · ALDOT · 20250926027 · $210.00 per LF · qty 10.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $105.00 per LF · qty 11.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $107.10 per LF · qty 132.0 · bid tab
water main 8-inchLF2$107.62$105.00 to $110.25
Bids
  • 2025-09-26 · ALDOT · 20250926027 · $110.25 per LF · qty 612.0 · bid tab
  • 2025-04-25 · ALDOT · 20250425035 · $105.00 per LF · qty 30.0 · bid tab
water serviceLF1$21.00$21.00 to $21.00
Bids
  • 2025-04-25 · ALDOT · 20250425035 · $21.00 per LF · qty 32.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.