Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon24$85.31$64.00 to $140.00
Bids
  • 2026-03-27 · ALDOT · 20260327008 · $112.50 per Ton · qty 801.0 · bid tab
  • 2026-03-27 · ALDOT · 20260327008 · $86.63 per Ton · qty 13674.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130025 · $88.00 per Ton · qty 3040.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130025 · $67.00 per Ton · qty 6307.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130025 · $78.00 per Ton · qty 3204.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130025 · $82.00 per Ton · qty 1876.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130033 · $140.00 per Ton · qty 285.0 · bid tab
  • 2025-11-07 · ALDOT · 20251107039 · $108.75 per Ton · qty 407.0 · bid tab
  • 2025-11-07 · ALDOT · 20251107039 · $79.00 per Ton · qty 10952.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228019 · $76.50 per Ton · qty 493.0 · bid tab
(10 most recent of 24 shown; all in the Hubstake feed)
curb gutterLF5$43.00$24.00 to $190.00
Bids
  • 2026-01-30 · ALDOT · 20260130025 · $25.00 per LF · qty 7782.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228019 · $190.00 per LF · qty 543.0 · bid tab
  • 2024-06-28 · ALDOT · 20240628024 · $54.00 per LF · qty 33.0 · bid tab
  • 2024-06-28 · ALDOT · 20240628024 · $43.00 per LF · qty 36.0 · bid tab
  • 2024-06-28 · ALDOT · 20240628024 · $24.00 per LF · qty 87.0 · bid tab
excavation embankmentCUYD7$28.00$13.75 to $85.00
Bids
  • 2026-01-30 · ALDOT · 20260130025 · $23.00 per CUYD · qty 12535.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130025 · $13.75 per CUYD · qty 18467.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228019 · $85.00 per CUYD · qty 37.0 · bid tab
  • 2024-06-28 · ALDOT · 20240628024 · $21.00 per CUYD · qty 1405.0 · bid tab
  • 2024-06-28 · ALDOT · 20240628024 · $28.00 per CUYD · qty 1860.0 · bid tab
  • 2023-12-08 · ALDOT · 20231208004 · $48.00 per CUYD · qty 236.0 · bid tab
  • 2023-12-08 · ALDOT · 20231208004 · $55.00 per CUYD · qty 545.0 · bid tab
flexible baseSQYD1$9.70$9.70 to $9.70
Bids
  • 2026-01-30 · ALDOT · 20260130025 · $9.70 per SQYD · qty 20175.0 · bid tab
inlet headwallEach2$730.00$720.00 to $740.00
Bids
  • 2026-01-30 · ALDOT · 20260130025 · $720.00 per Each · qty 33.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130025 · $740.00 per Each · qty 5.0 · bid tab
lime cement stabilizationTon1$30.50$30.50 to $30.50
Bids
  • 2026-01-30 · ALDOT · 20260130025 · $30.50 per Ton · qty 4758.0 · bid tab
manholeEach5$3,700.00$690.00 to $4,700.00
Bids
  • 2026-01-30 · ALDOT · 20260130025 · $4,700.00 per Each · qty 2.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130025 · $4,700.00 per Each · qty 10.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130025 · $690.00 per Each · qty 14.0 · bid tab
  • 2024-06-28 · ALDOT · 20240628024 · $3,700.00 per Each · qty 5.0 · bid tab
  • 2024-06-28 · ALDOT · 20240628024 · $1,050.00 per Each · qty 3.0 · bid tab
storm pipe 18-inchLF5$86.00$63.00 to $280.00
Bids
  • 2026-01-30 · ALDOT · 20260130025 · $280.00 per LF · qty 2.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130025 · $160.00 per LF · qty 9.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130025 · $75.00 per LF · qty 385.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130025 · $86.00 per LF · qty 4350.0 · bid tab
  • 2024-06-28 · ALDOT · 20240628024 · $63.00 per LF · qty 329.0 · bid tab
storm pipe 24-inchLF3$110.00$95.00 to $110.00
Bids
  • 2026-01-30 · ALDOT · 20260130025 · $110.00 per LF · qty 2171.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130025 · $95.00 per LF · qty 208.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130025 · $110.00 per LF · qty 154.0 · bid tab
storm pipe 30-inchLF1$140.00$140.00 to $140.00
Bids
  • 2026-01-30 · ALDOT · 20260130025 · $140.00 per LF · qty 208.0 · bid tab
storm pipe 36-inchLF2$287.50$200.00 to $375.00
Bids
  • 2026-01-30 · ALDOT · 20260130025 · $200.00 per LF · qty 50.0 · bid tab
  • 2024-06-28 · ALDOT · 20240628024 · $375.00 per LF · qty 6.0 · bid tab
storm pipe 42-inchLF1$240.00$240.00 to $240.00
Bids
  • 2026-01-30 · ALDOT · 20260130025 · $240.00 per LF · qty 50.0 · bid tab
storm pipe (diameter not stated)LF3$165.00$135.00 to $280.00
Bids
  • 2026-01-30 · ALDOT · 20260130025 · $280.00 per LF · qty 13.0 · bid tab
  • 2024-06-28 · ALDOT · 20240628024 · $135.00 per LF · qty 44.0 · bid tab
  • 2023-12-08 · ALDOT · 20231208004 · $165.00 per LF · qty 13.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.