Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon31$134.00$110.92 to $696.00
Bids
  • 2025-09-26 · ALDOT · 20250926006 · $258.16 per Ton · qty 30.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926006 · $241.25 per Ton · qty 35.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926006 · $271.81 per Ton · qty 55.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926006 · $200.14 per Ton · qty 110.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926006 · $111.25 per Ton · qty 3250.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926006 · $132.83 per Ton · qty 795.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926006 · $110.92 per Ton · qty 2595.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926006 · $124.52 per Ton · qty 1475.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926006 · $211.83 per Ton · qty 205.0 · bid tab
  • 2024-12-06 · ALDOT · 20241206055 · $219.43 per Ton · qty 196.0 · bid tab
(10 most recent of 31 shown; all in the Hubstake feed)
curb gutterLF2$47.86$35.72 to $60.00
Bids
  • 2025-09-26 · ALDOT · 20250926006 · $35.72 per LF · qty 1935.0 · bid tab
  • 2023-12-08 · ALDOT · 20231208053 · $60.00 per LF · qty 465.0 · bid tab
excavation embankmentCUYD5$39.85$13.30 to $75.00
Bids
  • 2025-09-26 · ALDOT · 20250926006 · $17.87 per CUYD · qty 2734.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926006 · $13.30 per CUYD · qty 3619.0 · bid tab
  • 2024-12-06 · ALDOT · 20241206055 · $39.85 per CUYD · qty 209.0 · bid tab
  • 2023-12-08 · ALDOT · 20231208053 · $70.00 per CUYD · qty 75.0 · bid tab
  • 2023-12-08 · ALDOT · 20231208053 · $75.00 per CUYD · qty 50.0 · bid tab
inlet headwallEach1$508.21$508.21 to $508.21
Bids
  • 2025-09-26 · ALDOT · 20250926006 · $508.21 per Each · qty 4.0 · bid tab
lime cement stabilizationSQYD1$3.41$3.41 to $3.41
Bids
  • 2025-09-26 · ALDOT · 20250926006 · $3.41 per SQYD · qty 11913.0 · bid tab
lime cement stabilizationTon1$79.84$79.84 to $79.84
Bids
  • 2025-09-26 · ALDOT · 20250926006 · $79.84 per Ton · qty 1375.0 · bid tab
storm pipe 15-inchLF1$80.00$80.00 to $80.00
Bids
  • 2023-12-08 · ALDOT · 20231208053 · $80.00 per LF · qty 4.0 · bid tab
storm pipe 18-inchLF2$84.20$76.36 to $92.05
Bids
  • 2025-09-26 · ALDOT · 20250926006 · $92.05 per LF · qty 928.0 · bid tab
  • 2025-09-26 · ALDOT · 20250926006 · $76.36 per LF · qty 60.0 · bid tab
storm pipe 24-inchLF2$86.25$70.00 to $102.50
Bids
  • 2025-09-26 · ALDOT · 20250926006 · $102.50 per LF · qty 625.0 · bid tab
  • 2023-12-08 · ALDOT · 20231208053 · $70.00 per LF · qty 637.0 · bid tab
storm pipe 48-inchLF1$11.11$11.11 to $11.11
Bids
  • 2023-12-08 · ALDOT · 20231208053 · $11.11 per LF · qty 180.0 · bid tab
storm pipe (diameter not stated)LF4$166.72$106.87 to $219.71
Bids
  • 2025-09-26 · ALDOT · 20250926006 · $136.58 per LF · qty 135.0 · bid tab
  • 2024-12-06 · ALDOT · 20241206055 · $219.71 per LF · qty 32.0 · bid tab
  • 2024-04-26 · ALDOT · 20240426030 · $196.86 per LF · qty 22.0 · bid tab
  • 2024-04-26 · ALDOT · 20240426030 · $106.87 per LF · qty 35.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.