Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon18$89.38$68.00 to $203.00
Bids
  • 2025-07-25 · ALDOT · 20250725008 · $89.25 per Ton · qty 3514.0 · bid tab
  • 2025-07-25 · ALDOT · 20250725008 · $113.50 per Ton · qty 3016.0 · bid tab
  • 2025-07-25 · ALDOT · 20250725008 · $82.50 per Ton · qty 5035.0 · bid tab
  • 2025-07-25 · ALDOT · 20250725008 · $89.50 per Ton · qty 3799.0 · bid tab
  • 2025-07-25 · ALDOT · 20250725008 · $85.00 per Ton · qty 925.0 · bid tab
  • 2025-06-27 · ALDOT · 20250627020 · $203.00 per Ton · qty 176.0 · bid tab
  • 2025-06-27 · ALDOT · 20250627020 · $94.00 per Ton · qty 4843.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228020 · $88.00 per Ton · qty 27653.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228020 · $106.00 per Ton · qty 1776.0 · bid tab
  • 2024-11-08 · ALDOT · 20241108041 · $90.00 per Ton · qty 3625.0 · bid tab
(10 most recent of 18 shown; all in the Hubstake feed)
curb gutterLF1$30.00$30.00 to $30.00
Bids
  • 2025-07-25 · ALDOT · 20250725008 · $30.00 per LF · qty 10945.0 · bid tab
excavation embankmentCUYD3$26.00$21.00 to $100.00
Bids
  • 2025-07-25 · ALDOT · 20250725008 · $21.00 per CUYD · qty 18630.0 · bid tab
  • 2025-07-25 · ALDOT · 20250725008 · $26.00 per CUYD · qty 23913.0 · bid tab
  • 2025-07-25 · ALDOT · 20250725008 · $100.00 per CUYD · qty 149.0 · bid tab
flexible baseSQYD1$10.90$10.90 to $10.90
Bids
  • 2025-07-25 · ALDOT · 20250725008 · $10.90 per SQYD · qty 32135.0 · bid tab
inlet headwallEach2$700.00$700.00 to $700.00
Bids
  • 2025-07-25 · ALDOT · 20250725008 · $700.00 per Each · qty 14.0 · bid tab
  • 2025-07-25 · ALDOT · 20250725008 · $700.00 per Each · qty 2.0 · bid tab
lime cement stabilizationTon1$35.00$35.00 to $35.00
Bids
  • 2025-07-25 · ALDOT · 20250725008 · $35.00 per Ton · qty 6942.0 · bid tab
manholeEach2$4,675.00$4,675.00 to $4,675.00
Bids
  • 2025-07-25 · ALDOT · 20250725008 · $4,675.00 per Each · qty 3.0 · bid tab
  • 2025-07-25 · ALDOT · 20250725008 · $4,675.00 per Each · qty 1.0 · bid tab
storm pipe 18-inchLF1$97.75$97.75 to $97.75
Bids
  • 2025-07-25 · ALDOT · 20250725008 · $97.75 per LF · qty 4176.0 · bid tab
storm pipe 24-inchLF1$111.50$111.50 to $111.50
Bids
  • 2025-07-25 · ALDOT · 20250725008 · $111.50 per LF · qty 2444.0 · bid tab
storm pipe 42-inchLF1$200.00$200.00 to $200.00
Bids
  • 2025-07-25 · ALDOT · 20250725008 · $200.00 per LF · qty 52.0 · bid tab