Site-work prices, Franklin County, AL

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon27$87.00$63.00 to $193.45
Bids
  • 2026-02-27 · ALDOT · 20260227021 · $72.00 per Ton · qty 11445.0 · bid tab
  • 2026-02-27 · ALDOT · 20260227021 · $76.00 per Ton · qty 1155.0 · bid tab
  • 2026-02-27 · ALDOT · 20260227021 · $85.00 per Ton · qty 500.0 · bid tab
  • 2026-02-27 · ALDOT · 20260227021 · $64.00 per Ton · qty 10540.0 · bid tab
  • 2026-02-27 · ALDOT · 20260227021 · $96.00 per Ton · qty 1624.0 · bid tab
  • 2025-12-05 · ALDOT · 20251205030 · $97.00 per Ton · qty 3378.0 · bid tab
  • 2025-12-05 · ALDOT · 20251205030 · $87.00 per Ton · qty 500.0 · bid tab
  • 2025-12-05 · ALDOT · 20251205030 · $69.00 per Ton · qty 15802.0 · bid tab
  • 2025-12-05 · ALDOT · 20251205030 · $77.00 per Ton · qty 19520.0 · bid tab
  • 2025-03-28 · ALDOT · 20250328012 · $63.00 per Ton · qty 10882.0 · bid tab
(10 most recent of 27 shown; all in the Hubstake feed)
curb gutterLF1$48.00$48.00 to $48.00
Bids
  • 2024-03-29 · ALDOT · 20240329020 · $48.00 per LF · qty 60.0 · bid tab
excavation embankmentCUYD3$26.00$26.00 to $32.95
Bids
  • 2025-02-28 · ALDOT · 20250228001 · $26.00 per CUYD · qty 8506.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228001 · $26.00 per CUYD · qty 4634.0 · bid tab
  • 2024-08-30 · ALDOT · 20240830002 · $32.95 per CUYD · qty 1725.0 · bid tab
flexible baseSQYD2$24.55$15.00 to $34.10
Bids
  • 2025-02-28 · ALDOT · 20250228001 · $15.00 per SQYD · qty 2445.0 · bid tab
  • 2024-08-30 · ALDOT · 20240830002 · $34.10 per SQYD · qty 208.0 · bid tab
flexible baseTon8$42.00$30.00 to $400.00
Bids
  • 2026-02-27 · ALDOT · 20260227021 · $40.00 per Ton · qty 500.0 · bid tab
  • 2025-12-05 · ALDOT · 20251205011 · $400.00 per Ton · qty 10.0 · bid tab
  • 2025-12-05 · ALDOT · 20251205030 · $37.00 per Ton · qty 500.0 · bid tab
  • 2025-03-28 · ALDOT · 20250328012 · $31.50 per Ton · qty 500.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228001 · $44.00 per Ton · qty 100.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228001 · $44.00 per Ton · qty 33.0 · bid tab
  • 2024-08-30 · ALDOT · 20240830002 · $51.19 per Ton · qty 242.0 · bid tab
  • 2024-03-29 · ALDOT · 20240329020 · $30.00 per Ton · qty 1103.0 · bid tab
lime cement stabilizationSQYD1$9.10$9.10 to $9.10
Bids
  • 2024-08-30 · ALDOT · 20240830002 · $9.10 per SQYD · qty 207.0 · bid tab
manholeEach1$500.00$500.00 to $500.00
Bids
  • 2025-12-05 · ALDOT · 20251205011 · $500.00 per Each · qty 4.0 · bid tab
storm pipe 18-inchLF1$150.00$150.00 to $150.00
Bids
  • 2025-02-28 · ALDOT · 20250228001 · $150.00 per LF · qty 84.0 · bid tab
storm pipe 24-inchLF1$170.00$170.00 to $170.00
Bids
  • 2025-02-28 · ALDOT · 20250228001 · $170.00 per LF · qty 76.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.