Site-work prices, Etowah County, AL

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon39$139.82$73.97 to $420.00
Bids
  • 2026-07-31 · ALDOT · 20260731011 · $99.00 per Ton · qty 18122.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731011 · $99.00 per Ton · qty 2469.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731011 · $132.00 per Ton · qty 11644.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731011 · $140.00 per Ton · qty 1103.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731011 · $97.00 per Ton · qty 5907.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731011 · $110.00 per Ton · qty 1257.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731022 · $188.00 per Ton · qty 335.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731022 · $420.00 per Ton · qty 13.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731022 · $187.00 per Ton · qty 155.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731022 · $174.00 per Ton · qty 516.0 · bid tab
(10 most recent of 39 shown; all in the Hubstake feed)
concrete pavementCUYD2$831.29$712.58 to $950.00
Bids
  • 2026-01-30 · ALDOT · 20260130064 · $712.58 per CUYD · qty 9.0 · bid tab
  • 2024-09-27 · ALDOT · 20240927014 · $950.00 per CUYD · qty 700.0 · bid tab
concrete pavementLF3$2.75$1.50 to $3.00
Bids
  • 2026-01-30 · ALDOT · 20260130064 · $1.50 per LF · qty 7475.0 · bid tab
  • 2024-09-27 · ALDOT · 20240927014 · $3.00 per LF · qty 750.0 · bid tab
  • 2024-09-27 · ALDOT · 20240927014 · $2.75 per LF · qty 83975.0 · bid tab
concrete pavementSQYD1$6.80$6.80 to $6.80
Bids
  • 2024-09-27 · ALDOT · 20240927014 · $6.80 per SQYD · qty 82802.0 · bid tab
curb gutterLF9$70.00$18.00 to $111.72
Bids
  • 2026-07-31 · ALDOT · 20260731022 · $18.00 per LF · qty 2102.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130064 · $31.99 per LF · qty 2055.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130064 · $108.93 per LF · qty 35.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228040 · $70.00 per LF · qty 71.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228040 · $31.00 per LF · qty 1212.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228044 · $111.72 per LF · qty 69.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228044 · $111.72 per LF · qty 30.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228044 · $111.72 per LF · qty 147.0 · bid tab
  • 2024-11-08 · ALDOT · 20241108047 · $60.00 per LF · qty 144.0 · bid tab
excavation embankmentCUYD13$32.00$10.00 to $687.08
Bids
  • 2026-07-31 · ALDOT · 20260731022 · $18.72 per CUYD · qty 3162.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731022 · $14.32 per CUYD · qty 10048.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130001 · $12.00 per CUYD · qty 24920.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130001 · $22.50 per CUYD · qty 52056.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130064 · $50.69 per CUYD · qty 50.0 · bid tab
  • 2025-06-27 · ALDOT · 20250627033 · $30.00 per CUYD · qty 1950.0 · bid tab
  • 2025-06-27 · ALDOT · 20250627033 · $35.00 per CUYD · qty 1204.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228040 · $80.00 per CUYD · qty 82.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228040 · $42.00 per CUYD · qty 625.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228044 · $687.08 per CUYD · qty 10.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
flexible baseSQYD5$20.57$13.50 to $28.00
Bids
  • 2026-07-31 · ALDOT · 20260731022 · $20.57 per SQYD · qty 3613.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130001 · $13.50 per SQYD · qty 18157.0 · bid tab
  • 2025-06-27 · ALDOT · 20250627033 · $22.00 per SQYD · qty 2671.0 · bid tab
  • 2025-02-28 · ALDOT · 20250228040 · $28.00 per SQYD · qty 857.0 · bid tab
  • 2024-09-27 · ALDOT · 20240927009 · $18.00 per SQYD · qty 3797.0 · bid tab
flexible baseTon1$48.43$48.43 to $48.43
Bids
  • 2026-01-30 · ALDOT · 20260130064 · $48.43 per Ton · qty 482.0 · bid tab
inlet headwallEach3$1,500.00$1,186.46 to $1,775.56
Bids
  • 2026-07-31 · ALDOT · 20260731022 · $1,775.56 per Each · qty 1.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731022 · $1,186.46 per Each · qty 1.0 · bid tab
  • 2025-06-27 · ALDOT · 20250627033 · $1,500.00 per Each · qty 5.0 · bid tab
lime cement stabilizationSQYD1$12.32$12.32 to $12.32
Bids
  • 2026-07-31 · ALDOT · 20260731022 · $12.32 per SQYD · qty 324.0 · bid tab
manholeEach2$4,390.33$3,780.66 to $5,000.00
Bids
  • 2026-07-31 · ALDOT · 20260731022 · $3,780.66 per Each · qty 1.0 · bid tab
  • 2025-06-27 · ALDOT · 20250627033 · $5,000.00 per Each · qty 2.0 · bid tab
storm pipe 12-inchLF1$312.82$312.82 to $312.82
Bids
  • 2025-02-28 · ALDOT · 20250228044 · $312.82 per LF · qty 40.0 · bid tab
storm pipe 15-inchLF1$893.76$893.76 to $893.76
Bids
  • 2025-02-28 · ALDOT · 20250228044 · $893.76 per LF · qty 5.0 · bid tab
storm pipe 18-inchLF6$101.73$80.00 to $375.00
Bids
  • 2026-07-31 · ALDOT · 20260731022 · $118.08 per LF · qty 58.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731022 · $85.39 per LF · qty 524.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130001 · $80.00 per LF · qty 303.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130001 · $80.00 per LF · qty 112.0 · bid tab
  • 2025-06-27 · ALDOT · 20250627033 · $300.00 per LF · qty 6.0 · bid tab
  • 2025-06-27 · ALDOT · 20250627033 · $375.00 per LF · qty 44.0 · bid tab
storm pipe 24-inchLF2$94.00$90.00 to $98.00
Bids
  • 2026-07-31 · ALDOT · 20260731022 · $98.00 per LF · qty 158.0 · bid tab
  • 2026-01-30 · ALDOT · 20260130001 · $90.00 per LF · qty 398.0 · bid tab
storm pipe (diameter not stated)LF3$200.00$51.84 to $270.00
Bids
  • 2026-07-31 · ALDOT · 20260731022 · $200.00 per LF · qty 44.0 · bid tab
  • 2025-08-29 · ALDOT · 20250829017 · $51.84 per LF · qty 100.0 · bid tab
  • 2025-06-27 · ALDOT · 20250627004 · $270.00 per LF · qty 57.0 · bid tab
water main 10-inchLF1$121.36$121.36 to $121.36
Bids
  • 2026-07-31 · ALDOT · 20260731022 · $121.36 per LF · qty 488.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.