Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon32$125.00$87.65 to $316.18
Bids
  • 2026-08-28 · ALDOT · 20260828011 · $125.00 per Ton · qty 685.0 · bid tab
  • 2026-08-28 · ALDOT · 20260828011 · $130.00 per Ton · qty 310.0 · bid tab
  • 2026-08-28 · ALDOT · 20260828011 · $130.00 per Ton · qty 4900.0 · bid tab
  • 2026-08-28 · ALDOT · 20260828011 · $125.00 per Ton · qty 695.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $114.30 per Ton · qty 417.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $101.00 per Ton · qty 3302.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $97.22 per Ton · qty 694.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $95.24 per Ton · qty 694.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $140.42 per Ton · qty 131.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $113.88 per Ton · qty 1599.0 · bid tab
(10 most recent of 32 shown; all in the Hubstake feed)
curb gutterLF7$42.00$31.28 to $85.00
Bids
  • 2026-07-31 · ALDOT · 20260731017 · $72.00 per LF · qty 633.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $42.00 per LF · qty 7268.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $72.00 per LF · qty 243.0 · bid tab
  • 2024-03-29 · ALDOT · 20240329025 · $35.74 per LF · qty 458.0 · bid tab
  • 2024-03-29 · ALDOT · 20240329025 · $31.28 per LF · qty 1196.0 · bid tab
  • 2024-03-29 · ALDOT · 20240329025 · $31.28 per LF · qty 2415.0 · bid tab
  • 2024-01-26 · ALDOT · 20240126042 · $85.00 per LF · qty 15.0 · bid tab
excavation embankmentCUYD6$25.00$18.00 to $48.00
Bids
  • 2026-08-28 · ALDOT · 20260828011 · $25.00 per CUYD · qty 5393.0 · bid tab
  • 2026-08-28 · ALDOT · 20260828011 · $25.00 per CUYD · qty 4889.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $23.00 per CUYD · qty 6393.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $18.00 per CUYD · qty 9640.0 · bid tab
  • 2024-03-29 · ALDOT · 20240329025 · $34.42 per CUYD · qty 18184.0 · bid tab
  • 2024-03-29 · ALDOT · 20240329025 · $48.00 per CUYD · qty 8589.0 · bid tab
flexible baseSQYD2$16.50$16.00 to $17.00
Bids
  • 2026-08-28 · ALDOT · 20260828011 · $17.00 per SQYD · qty 6875.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $16.00 per SQYD · qty 13721.0 · bid tab
inlet headwallEach6$1,117.03$1,020.00 to $1,500.00
Bids
  • 2026-07-31 · ALDOT · 20260731017 · $1,025.00 per Each · qty 18.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $1,500.00 per Each · qty 4.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $1,250.00 per Each · qty 28.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $1,020.00 per Each · qty 5.0 · bid tab
  • 2024-03-29 · ALDOT · 20240329025 · $1,117.03 per Each · qty 2.0 · bid tab
  • 2024-03-29 · ALDOT · 20240329025 · $1,117.03 per Each · qty 1.0 · bid tab
lime cement stabilizationTon1$45.10$45.10 to $45.10
Bids
  • 2026-07-31 · ALDOT · 20260731017 · $45.10 per Ton · qty 3659.0 · bid tab
manholeEach5$5,500.00$4,388.96 to $6,500.00
Bids
  • 2026-07-31 · ALDOT · 20260731017 · $6,500.00 per Each · qty 2.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $5,500.00 per Each · qty 3.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $5,500.00 per Each · qty 3.0 · bid tab
  • 2024-03-29 · ALDOT · 20240329025 · $4,388.96 per Each · qty 1.0 · bid tab
  • 2024-03-29 · ALDOT · 20240329025 · $6,143.67 per Each · qty 3.0 · bid tab
storm pipe 15-inchLF1$78.10$78.10 to $78.10
Bids
  • 2024-03-29 · ALDOT · 20240329025 · $78.10 per LF · qty 11.0 · bid tab
storm pipe 18-inchLF3$61.70$61.70 to $113.95
Bids
  • 2026-07-31 · ALDOT · 20260731017 · $113.95 per LF · qty 109.0 · bid tab
  • 2024-03-29 · ALDOT · 20240329025 · $61.70 per LF · qty 599.0 · bid tab
  • 2024-03-29 · ALDOT · 20240329025 · $61.70 per LF · qty 22.0 · bid tab
storm pipe 22-inchLF1$102.84$102.84 to $102.84
Bids
  • 2024-03-29 · ALDOT · 20240329025 · $102.84 per LF · qty 701.0 · bid tab
storm pipe 24-inchLF3$122.00$120.00 to $181.15
Bids
  • 2026-08-28 · ALDOT · 20260828011 · $122.00 per LF · qty 93.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $120.00 per LF · qty 3016.0 · bid tab
  • 2024-03-29 · ALDOT · 20240329025 · $181.15 per LF · qty 4.0 · bid tab
storm pipe 30-inchLF2$136.50$125.00 to $148.00
Bids
  • 2026-08-28 · ALDOT · 20260828011 · $148.00 per LF · qty 28.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $125.00 per LF · qty 242.0 · bid tab
storm pipe 36-inchLF1$233.00$233.00 to $233.00
Bids
  • 2026-07-31 · ALDOT · 20260731017 · $233.00 per LF · qty 217.0 · bid tab
storm pipe 48-inchLF2$168.47$85.00 to $251.94
Bids
  • 2026-07-31 · ALDOT · 20260731017 · $85.00 per LF · qty 994.0 · bid tab
  • 2026-07-31 · ALDOT · 20260731017 · $251.94 per LF · qty 848.0 · bid tab
storm pipe 59-inchLF1$246.28$246.28 to $246.28
Bids
  • 2026-07-31 · ALDOT · 20260731017 · $246.28 per LF · qty 236.0 · bid tab
storm pipe 73-inchLF1$421.73$421.73 to $421.73
Bids
  • 2026-07-31 · ALDOT · 20260731017 · $421.73 per LF · qty 54.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.