Sheridan, WY
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: 1-inch line/3/4-inch meter water connection, water and sewer inspection, residential water PIF (interior EAU part) and sewer PIF at 8 EAUs (2,000 sq ft at 250 sf per EAU), and the residential building permit using the city own construction cost table (R-3 Type VB $113.85/sq ft, garage as Utility $45.09/sq ft). Image-only PDF: pages 12, 13, 20 and 21 read visually and transcribed into the stored .txt (original kept as .bak-empty). Not included: exterior EAUs x $81 in the water PIF (irrigated/exterior area not defined on the schedule), plan review, trade permits, utility deposit. Searched 2026-11-09 (lane A).
Water/sewer provider: City of Sheridan
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water connection, 1-inch line with 3/4-inch meter (meter $180 + tapping $190 + radio read $200) water | $570.00 per connection | $570 | Printed total; 1-inch line with 3/4-inch RDM meter is $819.08 Effective 2026-07-06 Source · FY27 Master Fee Schedule (approved July 6, 2026), page 20 Water Connection Fees fetched 2026-11-09, sha256 6d78af818102 |
| Water and sewer inspection permit | $50 per inspection | $50 | Printed Effective 2026-07-06 Source · FY27 Master Fee Schedule (approved July 6, 2026), page 20 Service Charges fetched 2026-11-09, sha256 6d78af818102 |
| Water plant investment fee (PIF), residential, interior portion water · computed | Water PIF = (Interior EAUs x $132) + (Exterior EAUs x $81); 1 EAU = 250 sf per EAU | $1,056 | Interior only: 2,000 sq ft heated / 250 = 8 EAUs x 132 = 1,056.00; exterior EAUs not included (irrigated area not defined on the schedule) Effective 2026-07-06 Source · FY27 Master Fee Schedule (approved July 6, 2026), page 21 Plant Investment Fees fetched 2026-11-09, sha256 6d78af818102 |
| Sewer plant investment fee (PIF), residential sewer · computed | Sewer PIF = Livable Area EAUs x $273; 1 EAU = 250 sf per EAU | $2,184 | 2,000 sq ft livable / 250 = 8 EAUs x 273 = 2,184.00 Effective 2026-07-06 Source · FY27 Master Fee Schedule (approved July 6, 2026), page 21 Plant Investment Fees fetched 2026-11-09, sha256 6d78af818102 |
| Residential building permit, new, over $100,000 valuation (city valuation $245,736 computed) permit · computed | ($100,000 x .03) + (balance x 0.017) x (0.8) valuation formula | $4,382.01 | (100,000 x .03 + 145,736 x 0.017) x 0.8 = 4,382.01; valuation = 2,000 sq ft x R-3 VB 113.85 + 400 sq ft garage x U VB 45.09 = 245,736 (city own cost table, page 13) Effective 2026-07-06 Source · FY27 Master Fee Schedule (approved July 6, 2026), pages 12-13 Building Permit Fee Calculations and Square Foot Construction Costs fetched 2026-11-09, sha256 6d78af818102 |
| Total listed | $8,242.01 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.