River Falls, WI
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: park, library and fire facilities impact fees (single family), 3/4-inch water impact and sewer connection fees, valuation building permit (plan review, plumbing and electric permits included in the building permit fee per the schedule), plan check and state seal (City of River Falls Fee Schedule amended November 2025). Valuation uses the project convention $380,268 (city fee schedule has no own table). Water impact and sewer connection amounts are "updated to CPI 1/1/21" per the schedule. Not included: voluntary inspection $100, plumbing inspection $75/hour, meter and tap costs (utility), area-specific lateral charges. Searched 2026-11-09 (lane A).
Water/sewer provider: City of River Falls
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Park facilities impact fee, single family parks | $577.28 per dwelling | $577.28 | Printed Effective 2025-11-01 Source · City of River Falls Fee Schedule (2026 Adopted Fees, amended November 2025), page 9 Impact Fees - Park/Fire/Library Facilities fetched 2026-11-09, sha256 4a0000c09b3a |
| Library facilities impact fee, single family impact | $352.09 per dwelling | $352.09 | Printed Effective 2025-11-01 Source · City of River Falls Fee Schedule (2026 Adopted Fees, amended November 2025), page 9 Impact Fees - Park/Fire/Library Facilities fetched 2026-11-09, sha256 4a0000c09b3a |
| Fire facilities impact fee, single family fire | $345.71 per dwelling | $345.71 | Printed Effective 2025-11-01 Source · City of River Falls Fee Schedule (2026 Adopted Fees, amended November 2025), page 9 Impact Fees - Park/Fire/Library Facilities fetched 2026-11-09, sha256 4a0000c09b3a |
| Water impact fee, 3/4-inch meter (ratio 1) water | $2,454 per meter, by size | $2,454 | Printed (total with sewer connection $4,178) Effective 2025-11-01 Source · City of River Falls Fee Schedule (2026 Adopted Fees, amended November 2025), page 9 Impact Fees - Water/Sewer fetched 2026-11-09, sha256 4a0000c09b3a |
| Sewer connection fee, 3/4-inch meter (ratio 1) sewer | $1,724 per meter, by size | $1,724 | Printed Effective 2025-11-01 Source · City of River Falls Fee Schedule (2026 Adopted Fees, amended November 2025), page 9 Impact Fees - Water/Sewer fetched 2026-11-09, sha256 4a0000c09b3a |
| Building permit, valuation tier $100,001 to $500,000 (valuation $380,268 computed) permit · computed | $959.25 for the first $100,000 plus $5.25 for each additional $1,000, or fraction thereof valuation tier | $2,434.50 | 959.25 + 5.25 x 281 (each $1,000 or fraction of 280,268) = 2,434.50; valuation 380,268 = ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400; plan review, plumbing and electric permits included Effective 2025-11-01 Source · City of River Falls Fee Schedule (2026 Adopted Fees, amended November 2025), page 8 Building Code fetched 2026-11-09, sha256 4a0000c09b3a |
| Plan check fee permit | $100 per plan | $100 | Printed Effective 2025-11-01 Source · City of River Falls Fee Schedule (2026 Adopted Fees, amended November 2025), page 8 Building Code fetched 2026-11-09, sha256 4a0000c09b3a |
| State seal, new single-family homes permit | $33 for new single-family homes only per home | $33 | Printed Effective 2025-11-01 Source · City of River Falls Fee Schedule (2026 Adopted Fees, amended November 2025), page 8 Building Code fetched 2026-11-09, sha256 4a0000c09b3a |
| Total listed | $8,020.58 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.