Yakima, WA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$12,553.60listed total
Nonerank by 2025 new single-family permits

Not included: Included: valuation permit and 65% plan review (on the city own valuation table, $369,456), SBCC charge, 3/4-inch domestic and distribution connection charges, installation fee, wastewater connection charge with administration and 6% city service charge, all from the 2026 master fee schedule (2026 column; several fees step up on Jan 1, 2027). No city impact fee schedule for single-family homes was found. Not included: base irrigation charge $0.073 per sq ft of residential parcel (when domestic water is used for irrigation), stormwater assessment (annual), contractor side-sewer and service installation costs, mechanical/plumbing permits, park/school/fire fees (none found), 1.5 times rates outside city. Searched 2026-11-09.

Water/sewer provider: City of Yakima (water, wastewater)

LinePrinted ratePrototypeReceipt
Building permit (valuation-based)
permit · computed
$914.88 for the first $100,000 plus $5.25 for each $1,000 or fraction thereof, $100,001 to $500,000
percent of valuation
$2,332.38City valuation $369,456 (Table 1-1: R-3 V-B $170.80 x 2,000 sq ft + U V-B $69.64 x 400 sq ft garage); 270 additional $1,000 units x 5.25 + 914.88 = 2,332.38. Uses the city own table, not the Padstake $380,268
Effective 2026-06-01
Source · City of Yakima Master Fee Schedule (Resolution R-2026-063, eff. June 1, 2026; file 26-Fee-Schedule-8.6.26), Table 1-2
fetched 2026-11-09, sha256 1cf528e430b4
Plan review
permit · computed
65% of the calculated Permit Fee
percent of permit fee
$1,516.0565% x 2,332.38 = 1,516.05
Effective 2026-06-01
Source · City of Yakima Master Fee Schedule (Resolution R-2026-063, eff. June 1, 2026; file 26-Fee-Schedule-8.6.26), Table 1-2 note a
fetched 2026-11-09, sha256 1cf528e430b4
State Building Code Council (SBCC) charge, residential building permit
permit
$6.50
per residential permit
$6.50Printed
Effective 2026-06-01
Source · City of Yakima Master Fee Schedule (Resolution R-2026-063, eff. June 1, 2026; file 26-Fee-Schedule-8.6.26)
fetched 2026-11-09, sha256 1cf528e430b4
Domestic water connection charge, 3/4-inch
water
$1,780.00
per meter
$1,780Printed
Effective 2026-06-01
Source · City of Yakima Master Fee Schedule (Resolution R-2026-063, eff. June 1, 2026; file 26-Fee-Schedule-8.6.26), Water & Irrigation
fetched 2026-11-09, sha256 1cf528e430b4
Distribution connection charge, 3/4-inch
water
$1,111.00
per meter
$1,111Printed
Effective 2026-06-01
Source · City of Yakima Master Fee Schedule (Resolution R-2026-063, eff. June 1, 2026; file 26-Fee-Schedule-8.6.26), Water & Irrigation
fetched 2026-11-09, sha256 1cf528e430b4
Water installation fee, 3/4-inch (effective Jan 1, 2026)
water
$2,758.00
per meter; $3,495 from Jan 1, 2027
$2,758Printed
Effective 2026-06-01
Source · City of Yakima Master Fee Schedule (Resolution R-2026-063, eff. June 1, 2026; file 26-Fee-Schedule-8.6.26), Water & Irrigation Installation Fees
fetched 2026-11-09, sha256 1cf528e430b4
Wastewater connection charge, 3/4-inch meter (effective Jan 1, 2026)
sewer
$2,827.00
per meter; $3,084 from Jan 1, 2027
$2,827Printed
Effective 2026-06-01
Source · City of Yakima Master Fee Schedule (Resolution R-2026-063, eff. June 1, 2026; file 26-Fee-Schedule-8.6.26), Wastewater
fetched 2026-11-09, sha256 1cf528e430b4
Wastewater connection administration charge
sewer
$53.05
per connection
$53.05Printed
Effective 2026-06-01
Source · City of Yakima Master Fee Schedule (Resolution R-2026-063, eff. June 1, 2026; file 26-Fee-Schedule-8.6.26), Related Service Fees
fetched 2026-11-09, sha256 1cf528e430b4
City service charge on wastewater connection charge
sewer · computed
6 % of connection charge
percent of connection charge
$169.626% x 2,827.00 = 169.62
Effective 2026-06-01
Source · City of Yakima Master Fee Schedule (Resolution R-2026-063, eff. June 1, 2026; file 26-Fee-Schedule-8.6.26), Related Service Fees
fetched 2026-11-09, sha256 1cf528e430b4
Total listed$12,553.60

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.