Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$22,203.42listed total
Nonerank by 2025 new single-family permits

Not included: Full total from the West Richland Master Fee Schedule effective Oct 1 2026 (city PDF). Included: water system development fee $6,617 and sewer system development fee $4,186 (inside city; outside city $9,926 and $6,279), water hookup $3,510 for a 3/4-inch meter and service, sewer inspection $85, park impact fee $3,285 (2026 rate), building permit $2,821.20 computed on 380,268 valuation plus 60% plan review $1,692.72 and state code fee $6.50. Not included: street restoration, $1,350 per-lot prepayment at plat, plumbing/mechanical permits, stormwater, school and fire fees, any 2027 CPI park increase. Read 2026-11-10.

Water/sewer provider: City of West Richland (water, sewer)

LinePrinted ratePrototypeReceipt
Water system development fee, single-family unit inside city (outside city $9,926)
water
$6,617
per dwelling unit
$6,617Printed; inside-city rate is the headline
Effective 2026-10-01
Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule E item 14
fetched 2026-11-10, sha256 0d6e6932dfc0
Sewer system development fee, single-family unit inside city (outside city $6,279)
sewer
$4,186
per dwelling unit
$4,186Printed; inside-city rate is the headline
Effective 2026-10-01
Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule E item 5b
fetched 2026-11-10, sha256 0d6e6932dfc0
Water connection hookup, 3/4-inch or 1-inch meter and service connection
tap
$3,510
each
$3,510Printed ($660 if only a meter is set in an existing box); restoration extra
Effective 2026-10-01
Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule E item 13
fetched 2026-11-10, sha256 0d6e6932dfc0
Sewer new-service inspection
tap
$85
each
$85Printed
Effective 2026-10-01
Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule E item 5a
fetched 2026-11-10, sha256 0d6e6932dfc0
Park impact fee, single-family (effective 1/1/2026)
parks
$3,285
per SFR
$3,285Printed
Effective 2026-10-01
Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule D item 9
fetched 2026-11-10, sha256 0d6e6932dfc0
Building permit, Table 1-A valuation 380,268: 1,093.05 + 6.15 x 281 per $1,000 over $100,000
permit · computed
$6.15
per additional $1,000 over $100,000 (base $1,093.05)
$2,821.20Computed: ICC R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400 = 380,268; each $1,000 or fraction rounds up
Effective 2026-10-01
Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule D Table 1-A
fetched 2026-11-10, sha256 0d6e6932dfc0
Residential plan review, 60% of building permit fee
permit · computed
60%
of building permit fee
$1,692.72Computed 0.60 x 2,821.20
Effective 2026-10-01
Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule D item F
fetched 2026-11-10, sha256 0d6e6932dfc0
State building code fee, IRC first unit
permit
$6.50
per unit
$6.50Printed
Effective 2026-10-01
Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule D item l
fetched 2026-11-10, sha256 0d6e6932dfc0
Total listed$22,203.42

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.