West Richland, WA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Full total from the West Richland Master Fee Schedule effective Oct 1 2026 (city PDF). Included: water system development fee $6,617 and sewer system development fee $4,186 (inside city; outside city $9,926 and $6,279), water hookup $3,510 for a 3/4-inch meter and service, sewer inspection $85, park impact fee $3,285 (2026 rate), building permit $2,821.20 computed on 380,268 valuation plus 60% plan review $1,692.72 and state code fee $6.50. Not included: street restoration, $1,350 per-lot prepayment at plat, plumbing/mechanical permits, stormwater, school and fire fees, any 2027 CPI park increase. Read 2026-11-10.
Water/sewer provider: City of West Richland (water, sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water system development fee, single-family unit inside city (outside city $9,926) water | $6,617 per dwelling unit | $6,617 | Printed; inside-city rate is the headline Effective 2026-10-01 Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule E item 14 fetched 2026-11-10, sha256 0d6e6932dfc0 |
| Sewer system development fee, single-family unit inside city (outside city $6,279) sewer | $4,186 per dwelling unit | $4,186 | Printed; inside-city rate is the headline Effective 2026-10-01 Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule E item 5b fetched 2026-11-10, sha256 0d6e6932dfc0 |
| Water connection hookup, 3/4-inch or 1-inch meter and service connection tap | $3,510 each | $3,510 | Printed ($660 if only a meter is set in an existing box); restoration extra Effective 2026-10-01 Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule E item 13 fetched 2026-11-10, sha256 0d6e6932dfc0 |
| Sewer new-service inspection tap | $85 each | $85 | Printed Effective 2026-10-01 Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule E item 5a fetched 2026-11-10, sha256 0d6e6932dfc0 |
| Park impact fee, single-family (effective 1/1/2026) parks | $3,285 per SFR | $3,285 | Printed Effective 2026-10-01 Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule D item 9 fetched 2026-11-10, sha256 0d6e6932dfc0 |
| Building permit, Table 1-A valuation 380,268: 1,093.05 + 6.15 x 281 per $1,000 over $100,000 permit · computed | $6.15 per additional $1,000 over $100,000 (base $1,093.05) | $2,821.20 | Computed: ICC R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400 = 380,268; each $1,000 or fraction rounds up Effective 2026-10-01 Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule D Table 1-A fetched 2026-11-10, sha256 0d6e6932dfc0 |
| Residential plan review, 60% of building permit fee permit · computed | 60% of building permit fee | $1,692.72 | Computed 0.60 x 2,821.20 Effective 2026-10-01 Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule D item F fetched 2026-11-10, sha256 0d6e6932dfc0 |
| State building code fee, IRC first unit permit | $6.50 per unit | $6.50 | Printed Effective 2026-10-01 Source · West Richland Master Fee Schedule eff Oct 1 2026 (read 2026-11-10), Schedule D item l fetched 2026-11-10, sha256 0d6e6932dfc0 |
| Total listed | $22,203.42 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.