Padstake
Menu

Thurston County Unincorporated Area, WA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. IMPACT FEES ONLY. Included: Thurston County parks impact fee and transportation impact fee at the highest of six areas (2026 schedule; source PDF is image-only and was read visually, text transcribed into the stored .txt, original kept as .bak-empty). No total is shown. Missing: school impact fees (district-set, collected by the county: Rochester $6,608, Tumwater $5,081, Yelm $6,812.32, North Thurston $1,847 for 3+ bedrooms, Olympia $0), fire district fees, building permit and plan review (county fee guide src 534 gives R-3 $169.09/sq ft and garage $66.20/sq ft valuation, 65% plan review, $6.50 state surcharge, and a valuation fee chart src 537; not loaded here), water and sewer connection (separate utilities, 2025 county rate sheet not read). Searched 2026-11-09.

Water/sewer provider: Thurston County (permits, impact fees); water and sewer by utility serving the parcel

LinePrinted ratePrototypeReceipt
Parks impact fee, single-family home
parks
$1,934.46
per dwelling unit (uniform across the county)
$1,934.46Printed
Effective 2026-01-01
Source · Thurston County 2026 Impact Fees (Building Development Center), transcribed from image-only PDF, 2026 Parks Impact Fees
fetched 2026-11-09, sha256 dc42742006c0
Transportation impact fee, single family detached (South + South UGA)
transportation
$5,404
per dwelling
$5,404Printed; highest printed area; Northwest $3,439, West and North $2,402, East + East UGA $3,030, Central UGAs $3,413
Effective 2026-01-01
Source · Thurston County 2026 Impact Fees (Building Development Center), transcribed from image-only PDF, 2026 Transportation Impact Fee Rate Schedule
fetched 2026-11-09, sha256 dc42742006c0

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.