Padstake
Menu

Redmond, WA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Impact fees verified only, city-collected impact fees. Included: Redmond WA transportation (highest printed, outside centers; in centers $7,668.97), parks, fire and Lake Washington School District impact fees effective Jan 1 2026. Missing: water and sewer connection charges (Redmond utility fees not located in a stored schedule), building permit and development review fees (not read), Washington state surcharge. Searched 2026-11-09.

Water/sewer provider: City of Redmond WA (impact fees)

LinePrinted ratePrototypeReceipt
Transportation impact fee, single family detached, outside centers (in centers $7,668.97)
transport
$10,107.51
per dwelling unit by location
$10,107.51Highest printed (outside centers) shown; in centers $7,668.97
Effective 2026-01-01
Source · City of Redmond 2026 Impact Fees Schedule (effective January 1, 2026), p.2
fetched 2026-11-09, sha256 c0e6e01d3f1e
Parks impact fee, single-family residences
parks
$6,914.63
per housing unit
$6,914.63Printed
Effective 2026-01-01
Source · City of Redmond 2026 Impact Fees Schedule (effective January 1, 2026), p.2
fetched 2026-11-09, sha256 c0e6e01d3f1e
Fire impact fee, single-family residences
fire
$148.78
per housing unit
$148.78Printed
Effective 2026-01-01
Source · City of Redmond 2026 Impact Fees Schedule (effective January 1, 2026), p.1
fetched 2026-11-09, sha256 c0e6e01d3f1e
School impact fee (Lake Washington School District), single-family dwelling unit
school
$7,277.00
per dwelling unit
$7,277Printed
Effective 2026-01-01
Source · City of Redmond 2026 Impact Fees Schedule (effective January 1, 2026), p.1
fetched 2026-11-09, sha256 c0e6e01d3f1e

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.