Port Townsend, WA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Impact fees and water/sewer charges from Port Townsend posted 2026 Utility Connection Fee List: water SDC $5,603, wastewater SDC $6,819 (2,000 sq ft house, band 1,901-2,600; ranges $1,871 to $10,011), water tap and meter box $1,800, meter install $450. Not included: stormwater SDC ($1,470 per 3,000 sq ft impervious area), sewer service and connection to the main (applicant responsibility; $4,500 repayment if city installed), building permit and plan review (not read), Public Works permit review fees, transportation/park fees, state building code fee. Read 2026-11-10.

Water/sewer provider: City of Port Townsend (water, sewer)

LinePrinted ratePrototypeReceipt
Water system development charge, 3/4-inch meter (1 ERU)
water
$5,603
per single-family connection
$5,603Printed
Effective 2026-01-01
Source · Port Townsend 2026 Utility Connection Fee List (revised 1/26; read 2026-11-10), page 1, Single Family Residential table
fetched 2026-11-10, sha256 c7a100082f31
Wastewater system development charge, house finished floor area 1,901-2,600 sq ft (1.3 ERU)
sewer
$6,819
per connection by floor area
$6,819Printed; 2,000 sq ft prototype falls in the 1,901-2,600 band (range $1,871 up to $10,011 by size)
Effective 2026-01-01
Source · Port Townsend 2026 Utility Connection Fee List (revised 1/26; read 2026-11-10), page 1, Single Family Residential table
fetched 2026-11-10, sha256 c7a100082f31
Water tap and meter box placement, 3/4-inch
water
$1,800
per connection
$1,800Printed
Effective 2026-01-01
Source · Port Townsend 2026 Utility Connection Fee List (revised 1/26; read 2026-11-10), page 1, Single Family Residential table
fetched 2026-11-10, sha256 c7a100082f31
Water meter install / drop-in, 3/4-inch
water
$450
per connection
$450Printed
Effective 2026-01-01
Source · Port Townsend 2026 Utility Connection Fee List (revised 1/26; read 2026-11-10), page 1, Single Family Residential table
fetched 2026-11-10, sha256 c7a100082f31

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.