Kennewick, WA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: valuation permit (Padstake standard valuation), 65% plan review, state fee, 3/4-inch water connection and area charge (7,000 sq ft lot), sewer WYE tap, sewer area charge, the meter hookup charge printed in the sewer connection section ($4,000, label ambiguous), and transportation (highest district) and park (West) impact fees from the 2026 master fee schedule. Not included: water frontage charge $9 per linear foot (frontage unknown), sewer stub $15 per linear foot, Southridge Area fire impact fee $1,144.81 (area only), school fees (district), stormwater utility charge (monthly), fixture, mechanical and plumbing permits, express permit convenience fee. Master fee schedule notes some fees in the municipal code not yet in the schedule remain valid. Searched 2026-11-09.
Water/sewer provider: City of Kennewick (water, sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Building permit (valuation-based, KMC 15.08.010) permit · computed | $993.75 for the first $100,000, plus $5.60 for each additional $1,000 or fraction thereof, up to and including $500,000 percent of valuation | $2,567.35 | Valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400); 281 additional $1,000 units x 5.60 + 993.75 = 2,567.35 Effective 2026-01-01 Source · City of Kennewick Master Fee Schedule, Yearly Update 2026, Building Permit Fees fetched 2026-11-09, sha256 ea54355c708d |
| Separate plan review fee permit · computed | 65% of building permit fee (due at submittal) percent of permit fee | $1,668.78 | 65% x 2,567.35 = 1,668.78 Effective 2026-01-01 Source · City of Kennewick Master Fee Schedule, Yearly Update 2026, Plan Review and Inspection Fees fetched 2026-11-09, sha256 ea54355c708d |
| State building fee, residential permit | $6.50 per permit | $6.50 | Printed Effective 2026-01-01 Source · City of Kennewick Master Fee Schedule, Yearly Update 2026, Plan Review and Inspection Fees fetched 2026-11-09, sha256 ea54355c708d |
| Water new connection service fee, 3/4-inch meter (inside city limits) water | $770 per meter (KMC 14.13.010) | $770 | Printed Effective 2026-01-01 Source · City of Kennewick Master Fee Schedule, Yearly Update 2026, Water Connection & Area Charges fetched 2026-11-09, sha256 ea54355c708d |
| Water area charge water · computed | $0.015 per sq. ft. (maximum $300 for residential) per sq ft of property | $105 | $0.015 x 7,000 sq ft lot = 105.00 (7,000 sq ft lot assumed) Effective 2026-01-01 Source · City of Kennewick Master Fee Schedule, Yearly Update 2026, Water Connection & Area Charges fetched 2026-11-09, sha256 ea54355c708d |
| Water meter hookup charge listed under sewer new connection charges (KMC 14.24.010), 3/4-inch inside city limits sewer | $4,000 per meter size | $4,000 | Printed; heading says Water Meter Hookup Charges and the table sits in the sewer connection section; $6,000 outside city limits Effective 2026-01-01 Source · City of Kennewick Master Fee Schedule, Yearly Update 2026, Sewer Connection & Area Charges fetched 2026-11-09, sha256 ea54355c708d |
| Sewer WYE tap (inside city limits) sewer | $100 per tap | $100 | Printed Effective 2026-01-01 Source · City of Kennewick Master Fee Schedule, Yearly Update 2026, Sewer Connection & Area Charges fetched 2026-11-09, sha256 ea54355c708d |
| Sanitary sewer area charge (KMC 14.24.020) sewer · computed | $.04 per sq. ft. of gross developed property per sq ft (minimum based on 20,000 sq ft unless the property is smaller) | $280 | $0.04 x 7,000 sq ft lot = 280.00 (7,000 sq ft lot assumed) Effective 2026-01-01 Source · City of Kennewick Master Fee Schedule, Yearly Update 2026, Sanitary Sewer Area Charge fetched 2026-11-09, sha256 ea54355c708d |
| Transportation impact fee, single family residential (District 1) transportation | $1,723 per dwelling | $1,723 | Printed; highest printed district; District 2 $1,127, District 3 $1,289, District 4 $442 Effective 2026-01-01 Source · City of Kennewick Master Fee Schedule, Yearly Update 2026, Transportation Impact Fees (TIF) Rates fetched 2026-11-09, sha256 ea54355c708d |
| Park impact fee, single-family unit (Service Area 1 - West) parks | $1,196 per unit | $1,196 | Printed; Service Area 2 East $989 Effective 2026-01-01 Source · City of Kennewick Master Fee Schedule, Yearly Update 2026, Park Impact Fees fetched 2026-11-09, sha256 ea54355c708d |
| Total listed | $12,416.63 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.