Grandview, WA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Utility connection charges only, from the city January 2026 rate sheet: water service 3/4-inch ($576 meter plus $110 capital cost) and sewer connection ($680 plus $20 inspection). April 28 2026 committee minutes discuss raising the water connection to $2,651 on July 1 2026 and the sewer to $2,651 (then $2,987 water and $4,622 sewer on July 1 2027); adoption was not confirmed, so these amounts may be out of date. Missing: building permit fees, general facilities or impact fees (none found), school fees. Searched 2026-11-09.

Water/sewer provider: City of Grandview (water, sewer)

LinePrinted ratePrototypeReceipt
Application for water service, 3/4-inch meter: meter cost $576.00 plus capital cost $110.00
water
686.00
per 3/4" service
$686Printed total cost
Effective 2025-12-15
Source · City of Grandview 2026 Utility Rates (printed 1/6/2026, effective 12/15/25), Additional Account Charges, Application for Water Service
fetched 2026-11-09, sha256 3204f967503e
Application for sewer service: connection fee $680.00 plus inspect fee $20.00
sewer
700.00
per connection
$700Printed total cost
Effective 2025-12-15
Source · City of Grandview 2026 Utility Rates (printed 1/6/2026, effective 12/15/25), Additional Account Charges, Application for Sewer Service
fetched 2026-11-09, sha256 3204f967503e

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.