Centralia, WA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Full total from Centralia posted documents. Included: water capital facilities charge $9,133 (Pressure Zone; Non-Pressure Zone $6,013) and wastewater capital facilities charge $9,480 for a 3/4-inch meter (Jan 1 2026 sheet, Ordinances 2224/2225), building permit $3,369.69 computed on 380,268 valuation plus 65% plan review $2,190.30 (Master Fee Schedule Resolution 2812, effective Jan 1 2025, titled 2025-2026; a newer edition was not found). Not included: water meter and service installation (water connection fees estimated by Public Works per CMC 15.04.080), electric service connection, stormwater, state building code fee, plumbing/mechanical permits, school and other districts. Read 2026-11-10.
Water/sewer provider: City of Centralia (water, sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water capital facilities charge, 3/4-inch meter (Pressure Zone $9,133 headline; Non-Pressure Zone $6,013) water | $9,133 per connection (3/4-inch meter) | $9,133 | Printed; highest printed area (Pressure Zone) is the headline, range $6,013 to $9,133 on the line Effective 2026-01-01 Source · Centralia Capital Facilities Charges, Ordinances 2224 and 2225, effective Jan 1 2026 (read 2026-11-10), Water fetched 2026-11-10, sha256 eb671c432567 |
| Wastewater capital facilities charge, 3/4-inch water meter sewer | $9,480 per connection (3/4-inch meter) | $9,480 | Printed Effective 2026-01-01 Source · Centralia Capital Facilities Charges, Ordinances 2224 and 2225, effective Jan 1 2026 (read 2026-11-10), Wastewater fetched 2026-11-10, sha256 eb671c432567 |
| Building permit, valuation 380,268: $1,304.34 + $7.35 x 281 per $1,000 over $100,000 permit · computed | $7.35 per additional $1,000 over $100,000 (base $1,304.34) | $3,369.69 | Computed: ICC R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400 = 380,268; each $1,000 or fraction rounds up Effective 2026-01-01 Source · Centralia 2025 Master Fee Schedule, Resolution 2812 (eff Jan 1 2025, titled 2025-2026; read 2026-11-10), Section 5.0 Building Permit Fees fetched 2026-11-10, sha256 f8f4d520c427 |
| Building plan review, single-family residential, 65% of building permit fee permit · computed | 65% of building permit fee | $2,190.30 | Computed 0.65 x 3,369.69 Effective 2026-01-01 Source · Centralia 2025 Master Fee Schedule, Resolution 2812 (eff Jan 1 2025, titled 2025-2026; read 2026-11-10), Section 5.0 Building Permit Fees fetched 2026-11-10, sha256 f8f4d520c427 |
| Total listed | $24,172.99 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.