Centralia, WA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$24,172.99listed total
Nonerank by 2025 new single-family permits

Not included: Full total from Centralia posted documents. Included: water capital facilities charge $9,133 (Pressure Zone; Non-Pressure Zone $6,013) and wastewater capital facilities charge $9,480 for a 3/4-inch meter (Jan 1 2026 sheet, Ordinances 2224/2225), building permit $3,369.69 computed on 380,268 valuation plus 65% plan review $2,190.30 (Master Fee Schedule Resolution 2812, effective Jan 1 2025, titled 2025-2026; a newer edition was not found). Not included: water meter and service installation (water connection fees estimated by Public Works per CMC 15.04.080), electric service connection, stormwater, state building code fee, plumbing/mechanical permits, school and other districts. Read 2026-11-10.

Water/sewer provider: City of Centralia (water, sewer)

LinePrinted ratePrototypeReceipt
Water capital facilities charge, 3/4-inch meter (Pressure Zone $9,133 headline; Non-Pressure Zone $6,013)
water
$9,133
per connection (3/4-inch meter)
$9,133Printed; highest printed area (Pressure Zone) is the headline, range $6,013 to $9,133 on the line
Effective 2026-01-01
Source · Centralia Capital Facilities Charges, Ordinances 2224 and 2225, effective Jan 1 2026 (read 2026-11-10), Water
fetched 2026-11-10, sha256 eb671c432567
Wastewater capital facilities charge, 3/4-inch water meter
sewer
$9,480
per connection (3/4-inch meter)
$9,480Printed
Effective 2026-01-01
Source · Centralia Capital Facilities Charges, Ordinances 2224 and 2225, effective Jan 1 2026 (read 2026-11-10), Wastewater
fetched 2026-11-10, sha256 eb671c432567
Building permit, valuation 380,268: $1,304.34 + $7.35 x 281 per $1,000 over $100,000
permit · computed
$7.35
per additional $1,000 over $100,000 (base $1,304.34)
$3,369.69Computed: ICC R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400 = 380,268; each $1,000 or fraction rounds up
Effective 2026-01-01
Source · Centralia 2025 Master Fee Schedule, Resolution 2812 (eff Jan 1 2025, titled 2025-2026; read 2026-11-10), Section 5.0 Building Permit Fees
fetched 2026-11-10, sha256 f8f4d520c427
Building plan review, single-family residential, 65% of building permit fee
permit · computed
65%
of building permit fee
$2,190.30Computed 0.65 x 3,369.69
Effective 2026-01-01
Source · Centralia 2025 Master Fee Schedule, Resolution 2812 (eff Jan 1 2025, titled 2025-2026; read 2026-11-10), Section 5.0 Building Permit Fees
fetched 2026-11-10, sha256 f8f4d520c427
Total listed$24,172.99

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.