Camas, WA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Full set of posted water, sewer, impact, tap and building permit lines (plumbing, mechanical and other items listed below are not included). Included: Camas traffic (highest district, North), fire, parks (1,001-2,000 sq ft band), school (Camas district) impact fees, water and sewer SDCs, 3/4-inch meter install, building permit and plan review on computed $380,268 valuation. Missing: plumbing and mechanical permits, Washington state building code surcharge (pass-through, amount not posted), water service tap by city time and material, latecomer or urban growth fees on some sites. Both Evergreen-district school fee and South-district traffic fee are lower and shown in the line labels. Searched 2026-11-09.
Water/sewer provider: City of Camas (water, sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Traffic impact fee, single family detached, highest printed district (TIF North; TIF South $4,262) transport · computed | 11,047 per dwelling by district | $11,047 | Highest printed district shown; range $4,262 to $11,047 Effective 2026-01-01 Source · City of Camas Impact Fees, System Development Charges & Connection Fees 2026, p.1 fetched 2026-11-09, sha256 f09831505da1 |
| Fire impact fee, single family detached, $0.72 per sq ft x 2,000 sq ft heated fire · computed | .72 psf per sq ft | $1,440 | 0.72 x 2,000 = $1,440 Effective 2026-01-01 Source · City of Camas Impact Fees, System Development Charges & Connection Fees 2026, p.1 fetched 2026-11-09, sha256 f09831505da1 |
| Park/open space impact fee, residential 1,001 to 2,000 sq ft parks | 7,896 per dwelling by size | $7,896 | 2,000 sq ft heated house falls in the 1,001 to 2,000 sq ft band Effective 2026-01-01 Source · City of Camas Impact Fees, System Development Charges & Connection Fees 2026, p.1 fetched 2026-11-09, sha256 f09831505da1 |
| School impact fee, single family detached, Camas school district (Evergreen district $6,432.62) school | 6,650.00 per dwelling | $6,650 | Camas district rate shown Effective 2026-01-01 Source · City of Camas Impact Fees, System Development Charges & Connection Fees 2026, p.1 fetched 2026-11-09, sha256 f09831505da1 |
| Water system development charge, 3/4-inch meter water | 9,449 per 3/4" meter | $9,449 | Printed Effective 2026-01-01 Source · City of Camas Impact Fees, System Development Charges & Connection Fees 2026, p.1 fetched 2026-11-09, sha256 f09831505da1 |
| Water meter install fee, 3/4-inch tap | 510 each | $510 | Printed; tapping the main and extending the service by city personnel is time and material and not included Effective 2026-01-01 Source · City of Camas Impact Fees, System Development Charges & Connection Fees 2026, p.1 fetched 2026-11-09, sha256 f09831505da1 |
| Sewer system development charge, residential sewer | 7,496 per residential unit | $7,496 | Printed Effective 2026-01-01 Source · City of Camas Impact Fees, System Development Charges & Connection Fees 2026, p.1 fetched 2026-11-09, sha256 f09831505da1 |
| Building permit, $100,001 to $500,000 tier, valuation $380,268 permit · computed | $1,607.00 first $100,000 + $10.00 per additional $1,000 or fraction valuation | $4,417 | $1,607 + 281 x $10 = $4,417 on computed valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400) Effective 2026-01-01 Source · City of Camas 2026 Fee Schedule p.14-15 fetched 2026-11-09, sha256 b12decd75e8d |
| Building plan review fee, 65% of building permit fee permit · computed | 65% of building permit fee | $2,871.05 | 0.65 x $4,417 = $2,871.05 Effective 2026-01-01 Source · City of Camas 2026 Fee Schedule p.15 fetched 2026-11-09, sha256 b12decd75e8d |
| Total listed | $51,776.05 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.