Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$39,494.93listed total
Nonerank by 2025 new single-family permits

Not included: Included: valuation permit, 65% plan review, state fee, new-home mechanical ($0.12/sq ft) and plumbing ($0.16/sq ft) permits on 2,000 sq ft heated, plot plan review, 3/4-inch meter and water SDC, sewer SDC (1 ERU), stormwater connection, and traffic, park and fire impact fees, all from the 2026 city fee schedule (inside city limits; outside is 1.5 times). Not included: school impact fees collected with the permit (Battle Ground School District $10,760; Hockinson $7,790; set by the districts), electrical permit (not found as a per-home line), 5/8-inch meter option, SDC/impact fee deferral fee, utility deposit and taxes. Searched 2026-11-09.

Water/sewer provider: City of Battle Ground (water, sewer, stormwater)

LinePrinted ratePrototypeReceipt
Building permit (valuation-based)
permit · computed
$1,325 for the first $100,000 plus $9.09 for each $1,000 or fraction thereof, to and including $500,000
percent of valuation
$3,879.29Valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400); 281 additional $1,000 units x 9.09 + 1,325 = 3,879.29
Effective 2026-01-01
Source · City of Battle Ground 2026 Fee Schedule (Resolution 25-12, effective 1/1/2026), Building Permits
fetched 2026-11-09, sha256 9079dce9f767
Building plan review
permit · computed
65% of permit fee
percent of permit fee
$2,521.5465% x 3,879.29 = 2,521.54
Effective 2026-01-01
Source · City of Battle Ground 2026 Fee Schedule (Resolution 25-12, effective 1/1/2026), Building Permits
fetched 2026-11-09, sha256 9079dce9f767
State building fee, residential
permit
$6.50
flat
$6.50Printed
Effective 2026-01-01
Source · City of Battle Ground 2026 Fee Schedule (Resolution 25-12, effective 1/1/2026), Building Permits
fetched 2026-11-09, sha256 9079dce9f767
New single family home mechanical permit
permit · computed
$.12 per finished square feet
per finished sq ft
$240$0.12 x 2,000 sq ft heated = 240.00
Effective 2026-01-01
Source · City of Battle Ground 2026 Fee Schedule (Resolution 25-12, effective 1/1/2026), Mechanical Permits
fetched 2026-11-09, sha256 9079dce9f767
New single family home plumbing permit
permit · computed
$.16 per finished square feet
per finished sq ft
$320$0.16 x 2,000 sq ft heated = 320.00
Effective 2026-01-01
Source · City of Battle Ground 2026 Fee Schedule (Resolution 25-12, effective 1/1/2026), Plumbing Permits
fetched 2026-11-09, sha256 9079dce9f767
Residential plot plan review
permit
$70
flat
$70Printed
Effective 2026-01-01
Source · City of Battle Ground 2026 Fee Schedule (Resolution 25-12, effective 1/1/2026), Land Use
fetched 2026-11-09, sha256 9079dce9f767
Water meter charge, 3/4-inch meter, city supplied and installed
water
$539.07
per meter
$539.07Printed
Effective 2026-01-01
Source · City of Battle Ground 2026 Fee Schedule (Resolution 25-12, effective 1/1/2026), Water Rates
fetched 2026-11-09, sha256 9079dce9f767
Water SDC connection fee, inside city limits, 3/4-inch meter
water
$6,222
per meter
$6,222Printed; 5/8-inch meter is $4,150; 3/4-inch assumed for a single-family home
Effective 2026-01-01
Source · City of Battle Ground 2026 Fee Schedule (Resolution 25-12, effective 1/1/2026), System Development Charge
fetched 2026-11-09, sha256 9079dce9f767
Sewer SDC connection fee, inside city limits, per ERU
sewer
$15,701
per ERU
$15,701Printed; 1 ERU assumed for a single-family home
Effective 2026-01-01
Source · City of Battle Ground 2026 Fee Schedule (Resolution 25-12, effective 1/1/2026), System Development Charge
fetched 2026-11-09, sha256 9079dce9f767
Stormwater drainage connection fee, per residence
stormwater
$495
per residence
$495Printed
Effective 2026-01-01
Source · City of Battle Ground 2026 Fee Schedule (Resolution 25-12, effective 1/1/2026), System Development Charge
fetched 2026-11-09, sha256 9079dce9f767
Traffic impact fee, single family
transportation
$3,943.44
per dwelling
$3,943.44Printed
Effective 2026-01-01
Source · City of Battle Ground 2026 Fee Schedule (Resolution 25-12, effective 1/1/2026), Impact Fee
fetched 2026-11-09, sha256 9079dce9f767
Park impact fee, single family
parks
$4,538.31
per dwelling
$4,538.31Printed
Effective 2026-01-01
Source · City of Battle Ground 2026 Fee Schedule (Resolution 25-12, effective 1/1/2026), Impact Fee
fetched 2026-11-09, sha256 9079dce9f767
Fire impact fee, single family
fire
$1,018.78
per dwelling
$1,018.78Printed
Effective 2026-01-01
Source · City of Battle Ground 2026 Fee Schedule (Resolution 25-12, effective 1/1/2026), Impact Fee
fetched 2026-11-09, sha256 9079dce9f767
Total listed$39,494.93

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.