Virginia Beach, VA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. IMPACT FEES VERIFIED ONLY. Included: Virginia Beach water and sewer capital recovery fees for a 5/8-inch single-family meter (pu.virginiabeach.gov Rates, Fees & Charges, src 741); sewer shown at the highest column (with city pump station, city-installed lines), range $631 developer-installed without pump station to $3,177. Missing: building permit fee schedule (not found), water tap and meter ($493) and sewer tap and cleanout ($450) fees (seen on a Mandatory Connection Fees page in a search snippet, not fetched), 50% sewer fee rule where gravity sewer is unavailable. Lane A 2026-11-09.
Water/sewer provider: City of Virginia Beach Public Utilities
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water capital recovery fee, single-family, 5/8-inch meter water | $2,900 per meter, by size | $2,900 | Printed Effective n/a Source · Rates, Fees & Charges, Capital Recovery Fees fetched 2026-11-09, sha256 6690abed1a97 |
| Sewer capital recovery fee, single-family, 5/8-inch meter, with connection to city pump station, city installed (highest; range $631 to $3,177) sewer | $3,177 per meter, by size and installer | $3,177 | Printed Effective n/a Source · Rates, Fees & Charges, Capital Recovery Fees fetched 2026-11-09, sha256 6690abed1a97 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.