Richmond, VA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: City of Richmond Fee Schedule (rev 07-01-2024, src 757; no newer revision found) and DPU Connection Charges effective July 1, 2026 (src 756, rendered page 1 transcribed into the stored text, original kept as .bak). Valuation $380,268 by the decided rule (schedule uses the higher of contractor estimate or RS Means). The water-only and wastewater-only tables add to the combined 5/8-inch total of $9,370. City-installed service schedule shown. Not included: 2% state surcharge, electrical/mechanical/plumbing permits, erosion and stormwater (RESMP) permit, meter. Lane A 2026-11-09.
Water/sewer provider: City of Richmond DPU
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Residential 1 and 2 family building permit, value of work $380,268 computed ($63.00 plus $6.07 per thousand or fraction over $2,000) permit · computed | $63.00 plus $6.07 per thousand valuation | $2,363.53 | 63.00 + 6.07 x 379 = 2363.53 (valuation computed per ICC data) Effective 2024-07-01 Source · City of Richmond Fee Schedule rev 07-01-2024 fetched 2026-11-09, sha256 7e163d96e41b |
| Certificate of occupancy permit | $263.00 flat | $263 | Printed Effective 2024-07-01 Source · Fee Schedule p. 2 fetched 2026-11-09, sha256 7e163d96e41b |
| Water connection, 5/8-inch: installation charge water | $5,500.00 per meter | $5,500 | Printed (Water Only schedule) Effective 2026-07-01 Source · DPU Connection Charges - Water Only fetched 2026-11-09, sha256 b54b576adcd1 |
| Water connection, 5/8-inch: capacity charge water | $810.00 per meter | $810 | Printed Effective 2026-07-01 Source · DPU Connection Charges - Water Only fetched 2026-11-09, sha256 b54b576adcd1 |
| Wastewater connection, 5/8-inch: inspection charge sewer | $1,500.00 per connection | $1,500 | Printed (Wastewater Only schedule) Effective 2026-07-01 Source · DPU Connection Charges - Wastewater Only fetched 2026-11-09, sha256 b54b576adcd1 |
| Wastewater connection, 5/8-inch: capacity charge sewer | $1,560.00 per connection | $1,560 | Printed Effective 2026-07-01 Source · DPU Connection Charges - Wastewater Only fetched 2026-11-09, sha256 b54b576adcd1 |
| Total listed | $11,996.53 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.